{
  "html_url": "https://licitia.com.mx/adjudicacion/ao-50-gyr-050gyr072-n-23-2024",
  "canonical": "https://licitia.com.mx/adjudicacion/ao-50-gyr-050gyr072-n-23-2024",
  "id": "537953d5b3504ae08653e769770f331d",
  "procedure_number": "AO-50-GYR-050GYR072-N-23-2024",
  "file_number": "E-2024-00034052",
  "title": "PROYECTO INTEGRAL PARA LA CONSTRUCCION DE UMF 10+5 CONSULTORIOS CON AMC",
  "description": {
    "short": "Se haya declarado desierta una licitación pública, siempre que se mantengan los requisitos establecidos en la convocatoria.",
    "detailed": "LA CONTRATACION  DE LOS SERVICIOS DE UN PROYECTO INTEGRAL EL CUAL SE CONFORME DE LA REALIZACION DEL PROYECTO EJECUTIVO, Y LA CONSTRUCCION DE  LA UNIDAD MEDICA DE 10 CONSULTORIOS CON ATENCION MEDICA CONTINUA, Y LOS SERVICIOS RELACIONADOS COMO SON D.R.O., UNIDAD DE VERIFICACION DE INSTALACIONES, LABORATORIO DE MATERIALES Y VERIFICACION DE TOPOGRAFIA"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "IMSS",
    "acronym": "IMSS",
    "branch": "50 - INSTITUTO MEXICANO DEL SEGURO SOCIAL",
    "buying_unit": "00641206",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DEPARTAMENTO DE CONSTRUCCIÓN Y PLANEACIÓN INMOBILIARIA DE SALTILLO COAHUILA",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "imss",
    "unit_slug": "departamento-de-construccion-y-planeacion-inmobiliaria-de-saltillo-coahuila-050gyr072"
  },
  "classification": {
    "procedure_type": "ADJUDICACIÓN DIRECTA",
    "contracting_type": "SERVICIOS RELACIONADOS CON LA OBRA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "66",
    "exception_basis": "Art. 42 fr. VII",
    "internal_control_number": "CONSTRUC2024 21050002",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-07-19T18:47:04.000Z",
    "clarification_meeting_at": null,
    "clarification_questions_deadline_at": null,
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-07-24T16:00:00.000Z",
    "award_at": "2024-07-02T21:40:00.000Z",
    "estimated_contract_at": "2024-08-16T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2024-08-16T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "33201-0005",
          "specific_item_code": "33201",
          "cucop_description": "SERVICIOS DE DISEÑO, ARQUITECTURA, INGENIERIA Y ACTIVIDADES RELACIONADAS",
          "description": "PROYECTO INTEGRAL EN LA CONSTRUCCION DE LA UMF 10+5 CONSULTORIOS CON AMC EN SALTILLO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2024-00117858",
      "internal_reference": "2-21050002-4-05454",
      "title": "PROYECTO INTEGRAL PARA LA CONSTRUCCION DE UMF 10+5 CONSULTORIOS CON AMC",
      "status": "PUBLICADO",
      "contractor": {
        "name": "GRUPO INMOBILIARIO REAL DEL BOSQUE SA DE CV",
        "normalized_name": "GRUPO INMOBILIARIO REAL DEL BOSQUE",
        "rfc_type": null,
        "slug": "grupo-inmobiliario-real-del-bosque"
      },
      "contract_period": {
        "published_at": "2026-02-20T20:44:21.000Z",
        "starts_at": "2024-08-16T06:00:00.000Z",
        "ends_at": "2026-04-30T06:00:00.000Z"
      },
      "value": {
        "subtotal": "113126843.32",
        "tax": "18100294.93",
        "total": "131227138.25",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "33201-0005",
          "description": "PROYECTO INTEGRAL EN LA CONSTRUCCION DE LA UMF 10+5 CONSULTORIOS CON AMC EN SALTILLO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "113126843.32",
          "tax": "18100294.93",
          "other_taxes": null,
          "total": "131227138.25"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "TR PI UMF 10+5 con AMC Santa Barbara Saltillo Coah DOPS.pdf",
      "availability": "available",
      "size_bytes": "2164183",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T18:27:53.866Z",
      "updated_at": "2025-12-04T18:27:53.867Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "JUSTIFICACIÓN DE EXCEPCIÓN",
      "filename": "ARTICULO QUE ALUDE AL ART 41 AO N 23 2024.pdf",
      "availability": "available",
      "size_bytes": "2975910",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T18:28:02.877Z",
      "updated_at": "2025-12-04T18:28:02.878Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "04_PC-SROP_Modalidad_Precio_Alzado_V2.5_VF serv pre alz.pdf",
      "availability": "available",
      "size_bytes": "386966",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T18:27:56.186Z",
      "updated_at": "2025-12-04T18:27:56.187Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "oficio de adjudicacion",
      "filename": "OFICIO 0795 AO N 23 22024 PROYECTO INTEGRAL SANTA BARBARA.pdf",
      "availability": "available",
      "size_bytes": "1556643",
      "mime_type": "application/pdf",
      "sha256": "8c6f88f3bd074193f24f33f6665e9bacbc8cd9e87349fd689dc8ef107491486b",
      "uploaded_at": "2025-12-04T18:28:07.156Z",
      "updated_at": "2026-08-05T21:58:36.280Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "AVISO FE ERRATAS CONTRATO",
      "filename": "FE ERRATAS STA BARBARA.pdf",
      "availability": "available",
      "size_bytes": "196905",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T18:28:08.891Z",
      "updated_at": "2025-12-04T18:28:08.892Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "OFICIO DE ADJUDICACIÓN",
      "filename": "OFICIO 0795 AO N 23 22024 PROYECTO INTEGRAL SANTA BARBARA.pdf",
      "availability": "available",
      "size_bytes": "1556643",
      "mime_type": "application/pdf",
      "sha256": "8c6f88f3bd074193f24f33f6665e9bacbc8cd9e87349fd689dc8ef107491486b",
      "uploaded_at": "2025-12-04T18:28:13.184Z",
      "updated_at": "2026-08-05T21:58:36.280Z"
    },
    {
      "id": "42e005a4-d8c1-4e33-b9a3-f1880b6310ac",
      "annex_number": 10,
      "document_type": null,
      "description": "ANEXOS OFICIO DE ADJUDICACIÓN",
      "filename": "CONVENIO C1 SBA.pdf",
      "availability": "available",
      "size_bytes": "2054533",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-08-01T12:45:19.386Z",
      "updated_at": "2026-08-01T12:45:19.388Z"
    },
    {
      "id": "152ad7ee-9bd8-40dc-97f0-633562902786",
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXOS OFICIO DE ADJUDICACIÓN",
      "filename": "C2 STA BARBARA.pdf",
      "availability": "available",
      "size_bytes": "2414434",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2026-08-01T12:45:25.628Z",
      "updated_at": "2026-08-01T12:45:25.629Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "ao-50-gyr-050gyr072-n-32-2023",
      "nombre_procedimiento": "SERVICIOS RELACIONADOS CON LA OBRA PUBLICA, DE DRO EN LA UCIA MONCLOVA",
      "dependencia": "IMSS",
      "siglas": "IMSS",
      "score": 0.11823899258607429
    },
    {
      "numero_procedimiento": "ao-50-gyr-050gyr042-n-39-2023",
      "nombre_procedimiento": "ELABORACION DE PLANOS ARQUITECTONICOS EN DIVERSAS UNIDADES DEL OOAD TAMAULIPAS",
      "dependencia": "IMSS",
      "siglas": "IMSS",
      "score": 0.13301527500152588
    },
    {
      "numero_procedimiento": "aa-50-gyr-050gyr045-n-48-2024",
      "nombre_procedimiento": "CONTRAT. DEL SERV. DE ELABORACIÓN DE PLANOS ARQUITECTÓNICOS",
      "dependencia": "INSTITUTO MEXICANO DEL SEGURO SOCIAL",
      "siglas": "IMSS",
      "score": 0.1340017755029408
    },
    {
      "numero_procedimiento": "ao-50-gyr-050gyr072-n-2-2024",
      "nombre_procedimiento": "SERVICIOS RELACIONADOS CON LA OBRA PUBLICA, SERVICIOS DE DRO",
      "dependencia": "IMSS",
      "siglas": "IMSS",
      "score": 0.14110073867740414
    },
    {
      "numero_procedimiento": "ao-50-gyr-050gyr101-n-2-2024",
      "nombre_procedimiento": "ESTUDIOS DE INFRAESTRUCTURA DE SERVICIOS CHEMUYIL, TULUM, QUINTANA ROO",
      "dependencia": "IMSS",
      "siglas": "IMSS",
      "score": 0.15129361007492537
    },
    {
      "numero_procedimiento": "ao-50-gyr-050gyr110-n-24-2023",
      "nombre_procedimiento": "ELABORACIÓN DE PLANO TOPOGRÁFICO DEL CONJUNTO DELEGACIONAL IMSS QUERÉTARO, QRO.",
      "dependencia": "INSTITUTO MEXICANO DEL SEGURO SOCIAL",
      "siglas": "IMSS",
      "score": 0.15257363602079976
    }
  ]
}