  "html_url": "https://licitia.com.mx/adjudicacion/ao-83-g57-824040996-n-6-2023",
  "canonical": "https://licitia.com.mx/adjudicacion/ao-83-g57-824040996-n-6-2023",
  "id": "6bb0301904514be1b7bd3de0243fa7c3",
  "procedure_number": "AO-83-G57-824040996-N-6-2023",
  "file_number": "E-2023-00128256",
  "title": "1ª ETAPA DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE LA CALLE GUILLERMO PRIETO",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "1ª ETAPA DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE LA CALLE GUILLERMO PRIETO ENTRE CALLE LIBERTAD Y CALLE INDEPENDENCIA, ZONA CENTRO EN CABECERA MUNICIPAL DE TAMUÍN, S.L.P. ( DEMOLICION DE PAVIMENTO HIDRAULICO EXISTENTE, COLOCACION DE PEDRAPLEN, SUBBASE, BASE HIDRAULICA, MALLA ELECTROSOLDADA Y CONCRETO HIDRAULICO DE 15 CM DE ESPESOR, ASI COMO LA CONSTRUCCION DE GUARNICIONES Y BANQUETAS)"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "083G57",
    "acronym": "083G57",
    "branch": "83 - SAN LUIS POTOSÍ",
    "buying_unit": "COORDINACIÓN DE DESARROLLO SOCIAL",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "COORDINACIÓN DE DESARROLLO SOCIAL",
    "entity": null,
    "slug": "083g57",
    "unit_slug": "coordinacion-de-desarrollo-social-824040996"
  },
  "classification": {
    "procedure_type": "ADJUDICACIÓN DIRECTA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2023,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "74",
    "exception_basis": "Art. 43",
    "internal_control_number": "AO-83-G57-824040996-N-6-2023",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2023-12-12T16:10:11.000Z",
    "clarification_meeting_at": null,
    "clarification_questions_deadline_at": null,
    "clarification_responses_deadline_at": null,
    "bid_opening_at": null,
    "award_at": null,
    "estimated_contract_at": "2023-12-13T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2023-12-13T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "319 M2 DEMOLICION DE PAVIMENTO DE CONCRETO HIDRAULICO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "2",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "319.20 M2 LIMPIEZA Y TRAZO EN EL ÁREA DE TRABAJO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "3",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "271.32 M3 N-CTR-CAR-1-01-003/00 CORTES Y/O PARA EL AREA DE DESPLANTE DE LOS TERRAPLENES INCLUYE ACARREOS",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "4",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "47.88 M3 N-CTR-CAR-1-01-009/00 COMPACTACION DE TERRENO NATURAL, PARA NOVENA POR CIENTO (90%)",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "5",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "95.76 M3 EP. - 11 PEDRAPLEN RONSEADO CON TAMAÑO MAXIMO DE AGREGADO DE 10\"",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "6",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "63.84 M3 N-CTR-CAR-1-01-010/00 SUBRASANTE DE BANCO, PARA NOVENTA Y CINCO PORCIENTO (95%) P.U.O.T.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "7",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "63.84 M3 N-CTR-CAR1-04-002/03 BASE HIDRAULICA 100 % DE TRITURACION TOTAL, DEL BANCO QUE ELIJA EL CONTRATISTA INCLUYENDO ACARREOS, COMPACTADA AL CIEN POR CIENTO  (100%) P.U.O.T.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "8",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "319.20 M2 SUMINISTRO Y COLOCACIÓN DE MALLA ELECTROSOLDADA CALIBRE 6. INCLUYE CORTE,  TRASLPAPES Y LO NECESARIO PARA SU CORRECTO FUNCIONAMIENTO P.U.O.T.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "9",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "47.88 M3 SUMINISTRO Y COLOCACION DE CONCRETO HIDRAULICO PREMEZCLADO F'C=250KG/CM2 DE 15 CM DE ESPESOR T.M.A. 1 1/2\" INCLUYE: CURADO A BASE MEMBRANA COLOR BLANCO, VIBRADO CON VIBRADOR DE CHICOTE, ACABADO RAYADO CON CEPILLO METALICOPROPIO, CIMBRADO Y DESCIMBRADO, PRUEBAS DE LABORATORIO,",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "10",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "79.04 ML CORTE Y SELLADO DE JUNTA DE DILATACION A CADA 4.00 MTS. CON UNA PROFUNDIDAD DE 5 CMS DE ESPESOR INCLUYE: CALAFATEADO EN AMBOS SENTIDOS CON SIKAFLEX 1-A O SIMILAR, CORDON BACKER ROD CELL 1/4· (COLA DE RATA), MATERIALES, MANO DE OBRA, EQUIPO DE CORTE COMPLETO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "11",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "7 PZA REPOSICION DE TOMAS DOMICILIARIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "12",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "7 PZA REPOSICION DE DESCARGAS DOMICILIARIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        },
        {
          "number": "13",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "319.20 M2 LIMPIEZA GENERAL DE LA OBRA",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2023-00163317",
      "internal_reference": "AO-83-G57-824040996-N-6-2023",
      "title": "1ª ETAPA DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO DE LA CALLE GUILLERMO PRIETO",
      "status": "PUBLICADO",
      "contractor": {
        "name": "IVAN ARGUELLES GODOY",
        "normalized_name": "IVAN ARGUELLES GODOY",
        "rfc_type": null
      },
      "contract_period": {
        "published_at": "2023-12-12T16:10:11.000Z",
        "starts_at": "2023-12-13T06:00:00.000Z",
        "ends_at": "2023-12-30T06:00:00.000Z"
      },
      "value": {
        "subtotal": "425844.05",
        "tax": "68135.05",
        "total": "493979.1",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "319 M2 DEMOLICION DE PAVIMENTO DE CONCRETO HIDRAULICO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "52320.07",
          "tax": "8371.21",
          "other_taxes": null,
          "total": "60691.28"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "319.20 M2 LIMPIEZA Y TRAZO EN EL ÁREA DE TRABAJO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "5774.33",
          "tax": "923.89",
          "other_taxes": null,
          "total": "6698.22"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "271.32 M3 N-CTR-CAR-1-01-003/00 CORTES Y/O PARA EL AREA DE DESPLANTE DE LOS TERRAPLENES INCLUYE ACARREOS",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "44599.58",
          "tax": "7135.93",
          "other_taxes": null,
          "total": "51735.51"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "47.88 M3 N-CTR-CAR-1-01-009/00 COMPACTACION DE TERRENO NATURAL, PARA NOVENA POR CIENTO (90%)",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "1345.91",
          "tax": "215.35",
          "other_taxes": null,
          "total": "1561.26"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "95.76 M3 EP. - 11 PEDRAPLEN RONSEADO CON TAMAÑO MAXIMO DE AGREGADO DE 10\"",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "40308.26",
          "tax": "6449.32",
          "other_taxes": null,
          "total": "46757.58"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "63.84 M3 N-CTR-CAR-1-01-010/00 SUBRASANTE DE BANCO, PARA NOVENTA Y CINCO PORCIENTO (95%) P.U.O.T.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "29755.82",
          "tax": "4760.93",
          "other_taxes": null,
          "total": "34516.75"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "63.84 M3 N-CTR-CAR1-04-002/03 BASE HIDRAULICA 100 % DE TRITURACION TOTAL, DEL BANCO QUE ELIJA EL CONTRATISTA INCLUYENDO ACARREOS, COMPACTADA AL CIEN POR CIENTO  (100%) P.U.O.T.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "37152.96",
          "tax": "5944.47",
          "other_taxes": null,
          "total": "43097.43"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "319.20 M2 SUMINISTRO Y COLOCACIÓN DE MALLA ELECTROSOLDADA CALIBRE 6. INCLUYE CORTE,  TRASLPAPES Y LO NECESARIO PARA SU CORRECTO FUNCIONAMIENTO P.U.O.T.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "30649.58",
          "tax": "4903.93",
          "other_taxes": null,
          "total": "35553.51"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "47.88 M3 SUMINISTRO Y COLOCACION DE CONCRETO HIDRAULICO PREMEZCLADO F'C=250KG/CM2 DE 15 CM DE ESPESOR T.M.A. 1 1/2\" INCLUYE: CURADO A BASE MEMBRANA COLOR BLANCO, VIBRADO CON VIBRADOR DE CHICOTE, ACABADO RAYADO CON CEPILLO METALICOPROPIO, CIMBRADO Y DESCIMBRADO, PRUEBAS DE LABORATORIO,",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "131315.69",
          "tax": "21010.51",
          "other_taxes": null,
          "total": "152326.2"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "79.04 ML CORTE Y SELLADO DE JUNTA DE DILATACION A CADA 4.00 MTS. CON UNA PROFUNDIDAD DE 5 CMS DE ESPESOR INCLUYE: CALAFATEADO EN AMBOS SENTIDOS CON SIKAFLEX 1-A O SIMILAR, CORDON BACKER ROD CELL 1/4· (COLA DE RATA), MATERIALES, MANO DE OBRA, EQUIPO DE CORTE COMPLETO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "5106.77",
          "tax": "817.08",
          "other_taxes": null,
          "total": "5923.85"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "7 PZA REPOSICION DE TOMAS DOMICILIARIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "7789.6",
          "tax": "1246.34",
          "other_taxes": null,
          "total": "9035.94"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "7 PZA REPOSICION DE DESCARGAS DOMICILIARIAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "25709.39",
          "tax": "4113.5",
          "other_taxes": null,
          "total": "29822.89"
        },
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "319.20 M2 LIMPIEZA GENERAL DE LA OBRA",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "14016.09",
          "tax": "2242.59",
          "other_taxes": null,
          "total": "16258.68"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "CATALOGO GUILLERMO PRIETO.pdf",
      "availability": "available",
      "size_bytes": "438176",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T21:32:43.278Z",
      "updated_at": "2025-12-09T21:32:43.279Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "REQUERIMIENTO",
      "filename": "REQUERIMIENTO DE CONTRATACION.pdf",
      "availability": "available",
      "size_bytes": "995636",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T21:32:45.311Z",
      "updated_at": "2025-12-09T21:32:45.312Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "OFICIO DE ADJUDICACIÓN",
      "filename": "8.- FALLO.PDF",
      "availability": "available",
      "size_bytes": "1879992",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-09T21:32:47.847Z",
      "updated_at": "2025-12-09T21:32:47.848Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "ao-84-h19-825009977-n-2-2023",
      "nombre_procedimiento": "PAVIMENTACION CON CONCRETO HIDRAULICO EN CALLE MIXTECOS",
      "dependencia": "084H19",
      "siglas": "084H19",
      "score": 0.1805887710697177
    },
    {
      "numero_procedimiento": "ao-83-g57-824040996-n-8-2023",
      "nombre_procedimiento": "REHABILITACIÓN DE RED DE DRENAJE SANITARIO EN CALLE JUAN SOTELO",
      "dependencia": "083G57",
      "siglas": "083G57",
      "score": 0.19244375363997912
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-4-2023",
      "nombre_procedimiento": "“PAVIMENTACION CON CONCRETO HIDRAULICO DE LA CALLE XILITLA\"",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.2059208154678288
    },
    {
      "numero_procedimiento": "ao-87-j15-828025963-n-5-2025",
      "nombre_procedimiento": "CONSTRUCCIÓN DE PAVIMENTACIÓN HIDRAULICA EN C. MACARIO RAMIREZ ENTRE C. LAS BRIS",
      "dependencia": "087J15",
      "siglas": "087J15",
      "score": 0.2064071770663738
    },
    {
      "numero_procedimiento": "ao-84-h19-825009977-n-1-2024",
      "nombre_procedimiento": "PAVIMENTACION CALLEJON RIO PETATLAN",
      "dependencia": "084H19",
      "siglas": "084H19",
      "score": 0.21773164166619385
    },
    {
      "numero_procedimiento": "ao-83-g57-824040996-n-1-2023",
      "nombre_procedimiento": "REVESTIMIENTO DE CALLES EN CABECERA MUNICIPAL DE TAMUIN, S.L.P.",
      "dependencia": "TAMUÍN",
      "siglas": "083G57",
      "score": 0.22664203167402042
    }
  ]
}