{
  "html_url": "https://licitia.com.mx/adjudicacion/ao-83-g95-824016943-n-19-2024",
  "canonical": "https://licitia.com.mx/adjudicacion/ao-83-g95-824016943-n-19-2024",
  "id": "e55292b8ce644e498e3cb530b41138dd",
  "procedure_number": "AO-83-G95-824016943-N-19-2024",
  "file_number": "E-2025-00027225",
  "title": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE PRIVADA 1 DEL EJIDO CONSTITUCION",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE PRIVADA 1 DEL EJIDO CONSTITUCION EN EL NCPE PONCIANO ARRIAGA, MPIO DE EBANO, S.L.P."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "083G95",
    "acronym": "083G95",
    "branch": "83 - SAN LUIS POTOSÍ",
    "buying_unit": "MUNICIPIO DE EBANO S.L.P.",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "MUNICIPIO DE EBANO S.L.P.",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "083g95",
    "unit_slug": "coordinacion-de-desarrollo-social-824016943"
  },
  "classification": {
    "procedure_type": "ADJUDICACIÓN DIRECTA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "74",
    "exception_basis": "Art. 43",
    "internal_control_number": "EBANO/DSM/FEFYMPH/CD/05/2024",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-03-31T18:28:18.000Z",
    "clarification_meeting_at": null,
    "clarification_questions_deadline_at": null,
    "clarification_responses_deadline_at": null,
    "bid_opening_at": null,
    "award_at": null,
    "estimated_contract_at": "2025-03-18T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2025-03-18T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62502-0010",
          "specific_item_code": "62502",
          "cucop_description": "REHABILITACION DE TERRACERIA",
          "description": "SE REAHBILITARA LA PRIVADA 1 DEL EJIDO CONSTITUCION CON SUMINISTRO DE 192M3 DE MATERIAL DE REVESTIMIENTO",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2025-00029207",
      "internal_reference": "EBANO/DSM/FEFYMPH/CD/05/2024",
      "title": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE PRIVADA 1 DEL EJIDO CONSTITUCION",
      "status": "PUBLICADO",
      "contractor": {
        "name": "JAVIER ZAMORA GAZCA",
        "normalized_name": "JAVIER ZAMORA GAZCA",
        "rfc_type": null
      },
      "contract_period": {
        "published_at": "2025-03-31T18:28:18.000Z",
        "starts_at": "2025-03-18T06:00:00.000Z",
        "ends_at": "2025-03-25T06:00:00.000Z"
      },
      "value": {
        "subtotal": "286078.68",
        "tax": "45772.59",
        "total": "331851.27",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62502-0010",
          "description": "SE REAHBILITARA LA PRIVADA 1 DEL EJIDO CONSTITUCION CON SUMINISTRO DE 192M3 DE MATERIAL DE REVESTIMIENTO",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "286078.68",
          "tax": "45772.59",
          "other_taxes": null,
          "total": "331851.27"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "PRES 5.jpg",
      "availability": "available",
      "size_bytes": "1534222",
      "mime_type": "image/jpeg",
      "sha256": null,
      "uploaded_at": "2025-11-04T16:04:19.121Z",
      "updated_at": "2025-11-04T16:04:19.122Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "OFICIO DE ADJUDICACIÓN",
      "filename": "FALLO 5.pdf",
      "availability": "available",
      "size_bytes": "528807",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-04T16:04:31.329Z",
      "updated_at": "2025-11-04T16:04:31.330Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-20-2024",
      "nombre_procedimiento": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE PRIVADA 3 DEL EJIDO CONSTITUCION",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.030825495719909668
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-16-2024",
      "nombre_procedimiento": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE PRINCIPAL DEL EJIDO ANTIGUA",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.07669596949863144
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-13-2024",
      "nombre_procedimiento": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE INSURGENTES EN EL EJIDO DE VICHI",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.09893543117853432
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-14-2024",
      "nombre_procedimiento": "REHABILITACION A BASE DE REVESTIMIENTO EN CALLE NIÑOS HEROESEN EL EJIDO DE VICHI",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.09936671856839985
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-3-2024",
      "nombre_procedimiento": "\"REHABILITACION DE CALLE CAMPECHE Y DURANGO CON REVESTIMIENTO EN LA COLONIA OBRE",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.117693238395854
    },
    {
      "numero_procedimiento": "ao-83-g95-824016943-n-15-2024",
      "nombre_procedimiento": "REHABILITACION DE CAMINO AL ACCESO DEL RELLENO SANITARIO DE EBANO, S.L.P. DEL KM",
      "dependencia": "083G95",
      "siglas": "083G95",
      "score": 0.12697083514754826
    }
  ]
}