  "html_url": "https://licitia.com.mx/adjudicacion/ao-85-h90-826018993-n-55-2025",
  "canonical": "https://licitia.com.mx/adjudicacion/ao-85-h90-826018993-n-55-2025",
  "id": "261fb02d55044762a57bc7ce26b92ee0",
  "procedure_number": "AO-85-H90-826018993-N-55-2025",
  "file_number": "E-2025-00119425",
  "title": "CONSTRUCCION DE CUARTO DE CONTROL DE MAQUINAS PTAR NORTE",
  "description": {
    "short": "Peligre o alteración del orden social, economía, servicios públicos, salubridad, seguridad o ambiente, por caso fortuito o de fuerza mayor.",
    "detailed": "OBRA POR CONTINGENCIA. CONSTRUCCION DE CUARTO DE CONTROL DE MAQUINAS CON SUMINISTRO E INSTALACION DE SUBESTACIÓN ELECTRICA PARA EQUIPOS DE BOMBA\nTORNILLO Y PREPARACION ELECTRICA PARA EQUIPO DE AIREACION EN PLANTA TRATADORA DE AGUAS RESIDUALES NORTE DE CD. OBREGÓN"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "CAJEME",
    "acronym": "085H90",
    "branch": "85 - SONORA",
    "buying_unit": "DIRECCION ADMINISTRATIVA",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DIRECCION ADMINISTRATIVA",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "085h90",
    "unit_slug": "direccion-administrativa-826018993"
  },
  "classification": {
    "procedure_type": "ADJUDICACIÓN DIRECTA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "61",
    "exception_basis": "Art. 42 fr. II",
    "internal_control_number": "OOM-172/2025",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-12-19T19:37:20.000Z",
    "clarification_meeting_at": null,
    "clarification_questions_deadline_at": null,
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-12-20T00:00:00.000Z",
    "award_at": null,
    "estimated_contract_at": "2025-12-19T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2025-12-19T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "CONSTRUCC. DE CUARTO DE CONTROL DE MAQUINAS",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2025-00135494",
      "internal_reference": "OOM-172/2025",
      "title": "CONSTRUCCION DE CUARTO DE CONTROL DE MAQUINAS PTAR NORTE",
      "status": "PUBLICADO",
      "contractor": {
        "name": "LARE ELECTRICIDAD INDUSTRIAL SA DE CV",
        "normalized_name": "LARE ELECTRICIDAD INDUSTRIAL",
        "rfc_type": null,
        "slug": "lare-electricidad-industrial"
      },
      "contract_period": {
        "published_at": "2025-12-20T00:49:15.000Z",
        "starts_at": "2025-12-19T06:00:00.000Z",
        "ends_at": "2025-12-31T06:00:00.000Z"
      },
      "value": {
        "subtotal": "3093100.5",
        "tax": "494896.08",
        "total": "3587996.58",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "CONSTRUCC. DE CUARTO DE CONTROL DE MAQUINAS",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "3093100.5",
          "tax": "494896.08",
          "other_taxes": null,
          "total": "3587996.58"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "JUSTIFICACIÓN DE EXCEPCIÓN",
      "filename": "Dict Tecnico.pdf",
      "availability": "available",
      "size_bytes": "649638",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-20T01:20:13.794Z",
      "updated_at": "2025-12-20T01:20:13.795Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Especif Tec.pdf",
      "availability": "available",
      "size_bytes": "94235",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-20T01:20:11.847Z",
      "updated_at": "2025-12-20T01:20:11.848Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "OFICIO DE ADJUDICACIÓN",
      "filename": "Dict Adjud.pdf",
      "availability": "available",
      "size_bytes": "132249",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-20T01:20:15.593Z",
      "updated_at": "2025-12-20T01:20:15.594Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "ao-85-h90-826018993-n-12-2025",
      "nombre_procedimiento": "CONSTRUCCION DE CAJA DE VALVULAS, POZO MISIÓN DEL PRADO",
      "dependencia": "085H90",
      "siglas": "085H90",
      "score": 0.19972288608551025
    },
    {
      "numero_procedimiento": "ao-50-gyr-050gyr070-n-5-2023",
      "nombre_procedimiento": "AO-50-GYR-050GYR070-N-5-2023",
      "dependencia": "IMSS",
      "siglas": "IMSS",
      "score": 0.21229677127022772
    },
    {
      "numero_procedimiento": "ao-12-nce-012nce999-n-14-2023",
      "nombre_procedimiento": "PROYECTO EJECUTIVO PARA LA CONSTRUCCIÓN DE CUARTO DE MÁQUINASDE LA UAI DEL INGER",
      "dependencia": "INGER",
      "siglas": "INGER",
      "score": 0.21491918608305383
    },
    {
      "numero_procedimiento": "ao-84-w42-925004998-n-14-2025",
      "nombre_procedimiento": "OTRA CONSTRUCCIÓN/INMUEBLE DE LA CLB EN LA CIUDAD DE LOS MOCHIS, SINALOA",
      "dependencia": "084W42",
      "siglas": "084W42",
      "score": 0.21626408197069513
    },
    {
      "numero_procedimiento": "ao-18-tom-018tom999-n-83-2023",
      "nombre_procedimiento": "PROYECTO EJECUTIVO PARA CONSTRUCCIÓN DE EDIFICIO PARA OFICINAS CENTRALES CENACE",
      "dependencia": "CENACE",
      "siglas": "CENACE",
      "score": 0.21707997372984777
    },
    {
      "numero_procedimiento": "ao-13-j2r-013j2r001-n-8-2025",
      "nombre_procedimiento": "OBRAS INTERIORES PARA LA TERMINACIÓN DE LA TORRE PRINCIPAL DEL CCTM ENSENADA",
      "dependencia": "ASIPONA-Ensenada",
      "siglas": "ASIPONA-Ensenada",
      "score": 0.21825575828552246
    }
  ]
}