{
  "html_url": "https://licitia.com.mx/invitacion/io-09-210-009000999-n-7-2023",
  "canonical": "https://licitia.com.mx/invitacion/io-09-210-009000999-n-7-2023",
  "id": "9bbffb146c9b49b085d4a7ae81dff778",
  "procedure_number": "IO-09-210-009000999-N-7-2023",
  "file_number": "E-2023-00001675",
  "title": "REVISIÓN INTEGRAL DE LOS PROYECTOS EJECUTIVOS DE 2 (DOS) TÚNELES UBICADOS EN EL",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "REVISIÓN INTEGRAL DE LOS PROYECTOS EJECUTIVOS DE 2 (DOS) TÚNELES UBICADOS EN EL KM 1+000, DE UNA LONGITUD APROXIMADA DE 460 M Y EN EL KM 2+180, DE UNA LONGITUD APROXIMADA DE 1,000 M, CORRESPONDIENTES AL VIADUCTO TUJUANA, EN EL ESTADO DE BAJA CALIFORNIA."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
    "acronym": "SICT",
    "branch": "09 - INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
    "buying_unit": "DIRECCIÓN GENERAL DE CARRETERAS",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DIRECCIÓN GENERAL DE CARRETERAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "sict",
    "unit_slug": "direccion-general-de-carreteras-009000999"
  },
  "classification": {
    "procedure_type": "INVITACIÓN A CUANDO MENOS TRES PERSONAS",
    "contracting_type": "SERVICIOS RELACIONADOS CON LA OBRA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2023,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "59",
    "exception_basis": "Art. 43",
    "internal_control_number": "IO-009000999-E7-2023",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2023-01-25T02:12:49.000Z",
    "clarification_meeting_at": "2023-01-31T17:00:00.000Z",
    "clarification_questions_deadline_at": "2023-01-30T17:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2023-02-07T18:00:00.000Z",
    "award_at": "2023-02-10T18:00:00.000Z",
    "estimated_contract_at": "2023-02-15T06:00:00.000Z",
    "site_visit_at": null,
    "estimated_work_start_at": "2023-02-15T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62905-0007",
          "specific_item_code": "62905",
          "cucop_description": "ESTUDIO DE CONTROL DE CALIDAD PARA OBRA PUBLICA",
          "description": "REVISIÓN INTEGRAL DE LOS PROYECTOS EJECUTIVOS DE 2 (DOS) TÚNELES UBICADOS EN EL KM 1+000, DE UNA LONGITUD APROXIMADA DE 460 M Y EN EL KM 2+180, DE UNA LONGITUD APROXIMADA DE 1,000 M, CORRESPONDIENTES AL VIADUCTO TUJUANA, EN EL ESTADO DE BAJA CALIFORNIA.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2023-00007270",
      "internal_reference": "2023-09-CE-A-045-Y-00-2023",
      "title": "REVISIÓN INTEGRAL DE LOS PROYECTOS EJECUTIVOS DE 2 (DOS) TÚNELES UBICADOS EN EL",
      "status": "PUBLICADO",
      "contractor": {
        "name": "CONSULTEC, INGENIERIA, ARQUITECTURA Y SUPERVISION SA DE CV",
        "normalized_name": "CONSULTEC INGENIERIA ARQUITECTURA Y SUPERVISION",
        "rfc_type": null,
        "slug": "consultec-ingenieria-arquitectura-y-supervision"
      },
      "contract_period": {
        "published_at": "2023-04-12T16:48:39.000Z",
        "starts_at": "2023-02-20T06:00:00.000Z",
        "ends_at": "2023-05-20T06:00:00.000Z"
      },
      "value": {
        "subtotal": "3125283.66",
        "tax": "500045.39",
        "total": "3625329.05",
        "maximum_subtotal": null,
        "maximum_total": null,
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62905-0007",
          "description": "REVISIÓN INTEGRAL DE LOS PROYECTOS EJECUTIVOS DE 2 (DOS) TÚNELES UBICADOS EN EL KM 1+000, DE UNA LONGITUD APROXIMADA DE 460 M Y EN EL KM 2+180, DE UNA LONGITUD APROXIMADA DE 1,000 M, CORRESPONDIENTES AL VIADUCTO TUJUANA, EN EL ESTADO DE BAJA CALIFORNIA.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "3125283.66",
          "tax": "500045.39",
          "other_taxes": null,
          "total": "3625329.05"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "INVITACIÓN",
      "filename": "1. BASES IO-09-210-009000999-N-7-2023.docx",
      "availability": "available",
      "size_bytes": "265049",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:13.462Z",
      "updated_at": "2025-11-05T21:13:13.463Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "FORMA E-7 N-7-2023.xlsx",
      "availability": "available",
      "size_bytes": "564248",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:22.749Z",
      "updated_at": "2025-11-05T21:13:22.750Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "1. IO-09-210-009000999-N-7-2023 Términos Referencia.docx",
      "availability": "available",
      "size_bytes": "590984",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:31.732Z",
      "updated_at": "2025-11-05T21:13:31.733Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "2. IO-09-210-009000999-N-7-2023 Homologación.xlsx",
      "availability": "available",
      "size_bytes": "52433",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:40.673Z",
      "updated_at": "2025-11-05T21:13:40.674Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "Formato_RCDP_Documentacion_Presentada_Licitantes.pdf",
      "availability": "available",
      "size_bytes": "84818",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:49.548Z",
      "updated_at": "2025-11-05T21:13:49.549Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "MODELO_CONTRATO_GUIA_SERV_PU_12_NOV_10.pdf",
      "availability": "available",
      "size_bytes": "186883",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:13:57.748Z",
      "updated_at": "2025-11-05T21:13:57.749Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "S22001T101A S22001T101A 22.pdf",
      "availability": "available",
      "size_bytes": "296654",
      "mime_type": "application/pdf",
      "sha256": "7b082ddc73ff104739feb5e2e49b64098ca641d185a647ee3b877fcbc12c5ca5",
      "uploaded_at": "2025-11-05T21:14:07.132Z",
      "updated_at": "2026-08-06T02:30:15.974Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "S22001T201A S22001PT01A (1).pdf",
      "availability": "available",
      "size_bytes": "681237",
      "mime_type": "application/pdf",
      "sha256": "330e782438fabe28a2e06bde79bfec110b69df0562f327e6a69a6dc40f066794",
      "uploaded_at": "2025-11-05T21:14:16.432Z",
      "updated_at": "2026-08-06T02:30:15.401Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "DOCUMENTACION DISTINTA E7-2023.pdf",
      "availability": "available",
      "size_bytes": "486320",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:14:25.075Z",
      "updated_at": "2025-11-05T21:14:25.076Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "PROPUESTA TECNICA E7-2023.pdf",
      "availability": "available",
      "size_bytes": "286781",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:14:33.737Z",
      "updated_at": "2025-11-05T21:14:33.738Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXO DE INVITACIÓN",
      "filename": "PROPUESTA ECONOMICA E7-2023.pdf",
      "availability": "available",
      "size_bytes": "1245556",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:14:43.468Z",
      "updated_at": "2025-11-05T21:14:43.469Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA DE JUNTA DE ACLARACIONES N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "1468015",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:14:51.915Z",
      "updated_at": "2025-11-05T21:14:51.916Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "S22001T201A S22001PT01A (1).pdf",
      "availability": "available",
      "size_bytes": "681237",
      "mime_type": "application/pdf",
      "sha256": "330e782438fabe28a2e06bde79bfec110b69df0562f327e6a69a6dc40f066794",
      "uploaded_at": "2025-11-05T21:15:00.413Z",
      "updated_at": "2026-08-06T02:30:15.401Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "S22001T101A S22001T101A 22.pdf",
      "availability": "available",
      "size_bytes": "296654",
      "mime_type": "application/pdf",
      "sha256": "7b082ddc73ff104739feb5e2e49b64098ca641d185a647ee3b877fcbc12c5ca5",
      "uploaded_at": "2025-11-05T21:15:09.549Z",
      "updated_at": "2026-08-06T02:30:15.974Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "1. TERMINOS DE REFERENCIA N-7-2023.docx",
      "availability": "available",
      "size_bytes": "593011",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:15:19.012Z",
      "updated_at": "2025-11-05T21:15:19.013Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "2. FORMA E7 N-7-2023.xlsx",
      "availability": "available",
      "size_bytes": "560249",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:16:46.462Z",
      "updated_at": "2025-11-05T21:16:46.463Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "PLANO #1.dwg",
      "availability": "available",
      "size_bytes": "1044465",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:17:14.657Z",
      "updated_at": "2025-11-05T21:17:14.659Z"
    },
    {
      "id": null,
      "annex_number": 19,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "PLANO #2.dwg",
      "availability": "available",
      "size_bytes": "11490882",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:18:54.234Z",
      "updated_at": "2025-11-05T21:18:54.235Z"
    },
    {
      "id": null,
      "annex_number": 20,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "CIRCULAR 01 N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "348116",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:19:10.875Z",
      "updated_at": "2025-11-05T21:19:10.876Z"
    },
    {
      "id": null,
      "annex_number": 20,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA SEGUNDA JUNTA DE  ACLARACIONES N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "1452799",
      "mime_type": "application/pdf",
      "sha256": "2dc987c8e607bd3c53892145f902de63720e094d0cb2e41d1ea6e3c8da969d4f",
      "uploaded_at": "2025-11-05T21:19:26.871Z",
      "updated_at": "2026-08-06T02:30:16.430Z"
    },
    {
      "id": null,
      "annex_number": 21,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA SEGUNDA JUNTA DE  ACLARACIONES N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "1452799",
      "mime_type": "application/pdf",
      "sha256": "2dc987c8e607bd3c53892145f902de63720e094d0cb2e41d1ea6e3c8da969d4f",
      "uploaded_at": "2025-11-05T21:19:40.883Z",
      "updated_at": "2026-08-06T02:30:16.430Z"
    },
    {
      "id": null,
      "annex_number": 22,
      "document_type": null,
      "description": "ANEXO ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA DE PRESENTACION Y APERTURA N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "1968447",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:19:56.558Z",
      "updated_at": "2025-11-05T21:19:56.559Z"
    },
    {
      "id": null,
      "annex_number": 23,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "FALLO N-7-2023.pdf",
      "availability": "available",
      "size_bytes": "1548463",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-11-05T21:20:16.161Z",
      "updated_at": "2025-11-05T21:20:16.162Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "io-09-210-009000999-n-49-2023",
      "nombre_procedimiento": "ELABORACIÓN DE LOS ESTUDIOS Y PROYECTO DE INGENIERÍA PARA EL TÚNEL UBICADO EN EL",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.11458449283011107
    },
    {
      "numero_procedimiento": "io-09-210-009000999-n-52-2023",
      "nombre_procedimiento": "ELABORACIÓN DE LOS ESTUDIOS Y PROYECTOS DE INGENIERÍA DE: 1.- PUENTE VEHICULAR \"",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.15303320604760529
    },
    {
      "numero_procedimiento": "io-09-210-009000999-n-48-2023",
      "nombre_procedimiento": "1.- REVISIÓN DE 11 PROYECTOS ESTRUCTURALES (PUENTES Y VIADUCTOS) ELABORADOS POR",
      "dependencia": "INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
      "siglas": "SICT",
      "score": 0.1609878135905044
    },
    {
      "numero_procedimiento": "io-09-210-009000999-n-34-2023",
      "nombre_procedimiento": "TRABAJOS TÉCNICOS NECESARIOS PARA LA LIBERACIÓN DE DERECHO DE VÍA DEL VIADUCTO E",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.1681478023528994
    },
    {
      "numero_procedimiento": "io-09-210-009000999-n-47-2023",
      "nombre_procedimiento": "ELABORACIÓN DEL PROYECTO EJECUTIVO DE LA LIGA DEL RECINTO PORTUARIO CON LA TRON",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.16877438649825893
    },
    {
      "numero_procedimiento": "io-09-210-009000999-n-71-2023",
      "nombre_procedimiento": "ELABORACIÓN DE LOS ESTUDIOS Y PROYECTO DE INGENIERÍA DE 4 PUENTES UBICADOS SOBRE",
      "dependencia": "INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
      "siglas": "SICT",
      "score": 0.17235631777979687
    }
  ]
}