{
  "html_url": "https://licitia.com.mx/invitacion/io-69-q57-910018998-n-20-2024",
  "canonical": "https://licitia.com.mx/invitacion/io-69-q57-910018998-n-20-2024",
  "id": "6905272c16a841839da93357c49e9349",
  "procedure_number": "IO-69-Q57-910018998-N-20-2024",
  "file_number": "E-2024-00046651",
  "title": "CONSTRUCCION DE PLANTA POTABILIZADORA SAN PEDRO DEL GALLO",
  "description": {
    "short": "Obras públicas o servicios relacionados con las mismas, dentro de los montos máximos establecidos en el PEF.",
    "detailed": "\"CONSTRUCCIÓN DE PLANTA POTABILIZADORA A BASE DE OSMOSIS INVERSA, CON UNA CAPACIDAD DE 5 GPM, UBICADO EN LA LOCALIDAD DE SAN PEDRO DEL GALLO, DGO. LOCALIDAD DEL  MUNICIPIO DE SAN PEDRO DEL GALLO.\""
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "DESIERTO",
    "moved_at": null
  },
  "buyer": {
    "agency": "CAED",
    "acronym": "CAED",
    "branch": "69 - DURANGO",
    "buying_unit": "SUBDIRECCIÓN DE ADMINISTRACIÓN Y FINANZAS",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "SUBDIRECCIÓN DE ADMINISTRACIÓN Y FINANZAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "caed",
    "unit_slug": "subdireccion-de-administracion-y-finanzas-910018998"
  },
  "classification": {
    "procedure_type": "INVITACIÓN A CUANDO MENOS TRES PERSONAS",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "59",
    "exception_basis": "Art. 43",
    "internal_control_number": "POTABILIZADORA SAN PEDRO DEL GALLO CAED-PROAGUA-LOC-RURALES-025-24",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-05-14T00:20:21.000Z",
    "clarification_meeting_at": "2024-05-20T20:00:00.000Z",
    "clarification_questions_deadline_at": "2024-05-19T20:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-05-27T20:00:00.000Z",
    "award_at": "2024-06-03T20:00:00.000Z",
    "estimated_contract_at": "2024-06-04T06:00:00.000Z",
    "site_visit_at": "2024-05-17T20:00:00.000Z",
    "estimated_work_start_at": "2024-06-05T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62301-0001",
          "specific_item_code": "62301",
          "cucop_description": "CONSTRUCCION DE OBRA PARA EL ABASTECIMIENTO DE AGUA",
          "description": "\"CONSTRUCCIÓN DE PLANTA POTABILIZADORA A BASE DE OSMOSIS INVERSA, CON UNA CAPACIDAD DE 5 GPM, UBICADO EN LA LOCALIDAD DE SAN PEDRO DEL GALLO, DGO. LOCALIDAD DEL  MUNICIPIO DE SAN PEDRO DEL GALLO.\"",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "INVITACIÓN",
      "filename": "Oficio Invitacion San Pedro Gallo.pdf",
      "availability": "available",
      "size_bytes": "3225756",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:00.607Z",
      "updated_at": "2025-12-11T00:47:00.609Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "Diferimiento de Fallo N20 San Pedro Gallo POTABILIZADORA.pdf",
      "availability": "available",
      "size_bytes": "363183",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:25.111Z",
      "updated_at": "2025-12-11T00:47:25.112Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "Convocatoria Lic I3 TIPO OBRA N20 San pedro Gallo Potabilizadora.pdf",
      "availability": "available",
      "size_bytes": "630245",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:02.779Z",
      "updated_at": "2025-12-11T00:47:02.780Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "especificaciones",
      "filename": "5 Especificaciones_Tecnicas AP.docx",
      "availability": "available",
      "size_bytes": "613733",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:35.932Z",
      "updated_at": "2025-12-11T00:46:35.933Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "3 Modelo de contrato (3).pdf",
      "availability": "available",
      "size_bytes": "326030",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:38.509Z",
      "updated_at": "2025-12-11T00:46:38.511Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "catalogo de conceptos",
      "filename": "4 Planta potabilizadora San Pedro del Gallo.xlsx",
      "availability": "available",
      "size_bytes": "5690267",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:48.491Z",
      "updated_at": "2025-12-11T00:46:48.492Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "doc adicionales",
      "filename": "6 Doc Adicionales I3P EVALUACION BINARIA.doc (1).docx",
      "availability": "available",
      "size_bytes": "51611",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:49.893Z",
      "updated_at": "2025-12-11T00:46:49.894Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "doc tecnicos",
      "filename": "7 Adicionales Tecnicos I3P EVALUACION BINARIA.doc (1).docx",
      "availability": "available",
      "size_bytes": "123433",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:52.236Z",
      "updated_at": "2025-12-11T00:46:52.237Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "doc economicos",
      "filename": "8 Adicionales Economicos I3P EVALUACION BINARIA.doc (1).docx",
      "availability": "available",
      "size_bytes": "208691",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:53.704Z",
      "updated_at": "2025-12-11T00:46:53.705Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "prog anticipo",
      "filename": "9 Programa aplicacion anticipos I3P EVALUACION BINARIA.doc (1).docx",
      "availability": "available",
      "size_bytes": "22255",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:54.982Z",
      "updated_at": "2025-12-11T00:46:54.983Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "planos",
      "filename": "Plano Planta_Potabilizadora SAN PEDRO DEL GALLO.pdf",
      "availability": "available",
      "size_bytes": "241501",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:46:56.509Z",
      "updated_at": "2025-12-11T00:46:56.510Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Junta N20 San Pedro del Gallo POTABILIZADORA.pdf",
      "availability": "available",
      "size_bytes": "1829662",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:05.840Z",
      "updated_at": "2025-12-11T00:47:05.841Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "N 20 MODIFICADO SAN PEDRO DEL GALLO.xlsx",
      "availability": "available",
      "size_bytes": "5701127",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:14.985Z",
      "updated_at": "2025-12-11T00:47:14.987Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "Apertura N20 San Pedro Gallo PLANTA POTAB.pdf",
      "availability": "available",
      "size_bytes": "1652030",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:23.455Z",
      "updated_at": "2025-12-11T00:47:23.456Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "Fallo N20 San Pedro Gallo POTABILIZADORA.pdf",
      "availability": "available",
      "size_bytes": "1874322",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-11T00:47:30.367Z",
      "updated_at": "2025-12-11T00:47:30.369Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "io-69-q57-910018998-n-31-2023",
      "nombre_procedimiento": "EQUIPAMIENTO DE 2 PLANTAS POTABILIZADORAS SAN LUIS DEL CORDERO",
      "dependencia": "CAED",
      "siglas": "CAED",
      "score": 0.12989985942840576
    },
    {
      "numero_procedimiento": "io-16-b00-016b00985-n-35-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE PLANTA POTABILIZADORA, DURANGO",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.14054304361343384
    },
    {
      "numero_procedimiento": "io-69-q57-910018998-n-19-2024",
      "nombre_procedimiento": "CONSTRUCCION DE TANQUE SAN PEDRO DEL GALLO",
      "dependencia": "CAED",
      "siglas": "CAED",
      "score": 0.1545271873474121
    },
    {
      "numero_procedimiento": "io-72-550-813064932-n-1-2024",
      "nombre_procedimiento": "CONSTRUCCION DE SISTEMA INTEGRAL DE AGUA POT. DEL POZO JAGUEY ETAPA 5 DE 8",
      "dependencia": "TEPETITLÁN",
      "siglas": "072550",
      "score": 0.17275607585906982
    },
    {
      "numero_procedimiento": "io-16-b00-016b00985-n-34-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE PLANTAS POTABILIZADORAS EN VARIAS LOCALIDADES DE LOS MUNICIPIOS.",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.1736750602722168
    },
    {
      "numero_procedimiento": "io-16-b00-016b00985-n-46-2024",
      "nombre_procedimiento": "CONSTRUCCIÓN DE PLANTAS POTABILIZADORAS EN VARIAS LOCALIDADES DE LOS MUNICIPIOS.",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.17483460903167725
    }
  ]
}