{
  "html_url": "https://licitia.com.mx/licitacion/lo-09-210-009000999-n-90-2023",
  "canonical": "https://licitia.com.mx/licitacion/lo-09-210-009000999-n-90-2023",
  "id": "f68bc420ac7b424188e72031ab449a4f",
  "procedure_number": "LO-09-210-009000999-N-90-2023",
  "file_number": "E-2023-00035788",
  "title": "“SEGUIMIENTO DE PROYECTO EN OBRA, SUPERVISIÓN Y VERIFICACIÓN DE CALIDAD DE LA CO",
  "description": {
    "short": null,
    "detailed": "CONTROL DE PROYECTO EN OBRA, ASÍ COMO INSPECCIÓN, SEGUIMIENTO Y VERIFICACIÓN DE CALIDAD DE LA CONSTRUCCIÓN DEL PUENTE TIPO ARCO METALICO “RIZO DE ORO\", INCLUYE ACCESOS Y LIGA CON CAMINO EXISTENTE, PAVIMENTACIÓN, OBRAS COMPLEMENTARIAS Y SEÑALAMIENTO UBICADO EN EL KM 47+500 DEL TRAMO: RIZO DE ORO – LA CONCORDIA DE LA CARRETERA CHICOMUSELO – LA CONCORDIA, EN EL ESTADO DE CHIAPAS."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "CANCELADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "SICT",
    "acronym": "SICT",
    "branch": "09 - INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
    "buying_unit": "DIRECCIÓN GENERAL DE CARRETERAS",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DIRECCIÓN GENERAL DE CARRETERAS",
    "entity": null,
    "slug": "sict",
    "unit_slug": "direccion-general-de-carreteras-009000999"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "SERVICIOS RELACIONADOS CON LA OBRA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2023,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "LO-009000999-E90-2023",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2023-05-23T18:42:07.000Z",
    "clarification_meeting_at": "2023-06-14T16:30:00.000Z",
    "clarification_questions_deadline_at": "2023-06-13T16:30:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2023-06-22T18:00:00.000Z",
    "award_at": "2023-08-02T18:00:00.000Z",
    "estimated_contract_at": "2023-08-16T06:00:00.000Z",
    "site_visit_at": "2023-05-29T16:15:00.000Z",
    "estimated_work_start_at": "2023-08-16T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62905-0007",
          "specific_item_code": "62905",
          "cucop_description": "ESTUDIO DE CONTROL DE CALIDAD PARA OBRA PUBLICA",
          "description": "“SEGUIMIENTO DE PROYECTO EN OBRA, SUPERVISIÓN Y VERIFICACIÓN DE CALIDAD DE LA CONSTRUCCIÓN DEL PUENTE TIPO ARCO METALICO “RIZO DE ORO\", INCLUYE ACCESOS Y LIGA CON CAMINO EXISTENTE, PAVIMENTACIÓN, OBRAS COMPLEMENTARIAS Y SEÑALAMIENTO UBICADO EN EL KM 47+500 DEL TRAMO: RIZO DE ORO – LA CONCORDIA DE LA CARRETERA CHICOMUSELO – LA CONCORDIA, EN EL ESTADO DE CHIAPAS.\"",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "1.- BASES LO-09-210-009000999-N-90-2023 SUP RIZO DE ORO.docx",
      "availability": "available",
      "size_bytes": "127372",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:47.163Z",
      "updated_at": "2025-12-07T11:28:47.165Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FECHA Y HORA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA DE 3RA. JUNTA DE ACLARACIONES N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "13091600",
      "mime_type": "application/pdf",
      "sha256": "c4c5f13c8ae20f78c749c23f6f6ca45a80390a5d1ddeb4b51d3488b80e2c2f3f",
      "uploaded_at": "2025-12-07T11:29:44.988Z",
      "updated_at": "2026-08-06T03:26:21.865Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "OFICIO CIRCULAR 2 N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "377712",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:51.034Z",
      "updated_at": "2025-12-07T11:29:51.035Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "2.- CATALOGO DE CONCEPTOS  SUP. RISO DE ORO.xlsx",
      "availability": "available",
      "size_bytes": "278821",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:48.751Z",
      "updated_at": "2025-12-07T11:28:48.752Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "3. MODELO DE CONTRATO.pdf",
      "availability": "available",
      "size_bytes": "331465",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:49.971Z",
      "updated_at": "2025-12-07T11:28:49.972Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "6.- TERMINOS DE REFERENCIA SUP. RISO DE ORO",
      "filename": "6.- TERMINOS DE REFERENCIA SUP. RISO DE ORO.docx",
      "availability": "available",
      "size_bytes": "328041",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:51.345Z",
      "updated_at": "2025-12-07T11:28:51.346Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "7.- Matriz_Base_Servicios_P.U._Puntos_Forma_03__04-ENERO-2021_",
      "filename": "7.- Matriz_Base_Servicios_P.U._Puntos_Forma_03__04-ENERO-2021_.xlsx",
      "availability": "available",
      "size_bytes": "51747",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:52.953Z",
      "updated_at": "2025-12-07T11:28:52.954Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "MINUTA DE VISITA AL SITIO DE LOS TRABAJOS N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "450727",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:06.328Z",
      "updated_at": "2025-12-07T11:29:06.329Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "parametros",
      "filename": "1. DOCUMENTACION DISTINTA.pdf",
      "availability": "available",
      "size_bytes": "210027",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:54.242Z",
      "updated_at": "2025-12-07T11:28:54.243Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "parametros",
      "filename": "2. PROPUESTA TECNICA.pdf",
      "availability": "available",
      "size_bytes": "1626703",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:28:57.659Z",
      "updated_at": "2025-12-07T11:28:57.661Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "parametros",
      "filename": "3. PROPUESTA ECONOMICA.pdf",
      "availability": "available",
      "size_bytes": "1756449",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:00.397Z",
      "updated_at": "2025-12-07T11:29:00.398Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "5.- ESPECIFICACIONES DE SEGUIMIETO DE PROYECTO SUP. RISO DE ORO",
      "filename": "5.- ESPECIFICACIONES DE SEGUIMIETO DE PROYECTO SUP. RISO DE ORO.docx",
      "availability": "available",
      "size_bytes": "249012",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:01.891Z",
      "updated_at": "2025-12-07T11:29:01.892Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "4- ESPECIFICACIONES PARTICULARES SUP. RISO DE ORO",
      "filename": "4- ESPECIFICACIONES PARTICULARES SUP. RISO DE ORO.docx",
      "availability": "available",
      "size_bytes": "962232",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:03.620Z",
      "updated_at": "2025-12-07T11:29:03.621Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "8.- Metodo_Evaluacion_Servicios_P.U._Puntos-Forma_MVP_03__04-ENERO-2021_",
      "filename": "8.- Metodo_Evaluacion_Servicios.docx",
      "availability": "available",
      "size_bytes": "79053",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:05.132Z",
      "updated_at": "2025-12-07T11:29:05.133Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA PRIMERA JUNTA DE ACLARACIONES N-91-2023.pdf",
      "availability": "available",
      "size_bytes": "1967295",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:10.478Z",
      "updated_at": "2025-12-07T11:29:10.479Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "JUNTA DE ACLARACIONES N90",
      "filename": "Junta de Aclaraciones N-90.pdf",
      "availability": "available",
      "size_bytes": "3422287",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:14.453Z",
      "updated_at": "2025-12-07T11:29:14.454Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "2DA. JUNTA DE ACLARACIONES N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "6494312",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:17.826Z",
      "updated_at": "2025-12-07T11:29:17.827Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "Anexo  HOM-CATEGORIAS_Rizo de Oro.xlsx",
      "availability": "available",
      "size_bytes": "96751",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:19.119Z",
      "updated_at": "2025-12-07T11:29:19.120Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "ACTA DE 3RA. JUNTA DE ACLARACIONES N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "13091600",
      "mime_type": "application/pdf",
      "sha256": "c4c5f13c8ae20f78c749c23f6f6ca45a80390a5d1ddeb4b51d3488b80e2c2f3f",
      "uploaded_at": "2025-12-07T11:29:28.569Z",
      "updated_at": "2026-08-06T03:26:21.865Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "7.2.- Catalogo de Conceptos Complementado (Anexo No. 2).xlsx",
      "availability": "available",
      "size_bytes": "276374",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:29.886Z",
      "updated_at": "2025-12-07T11:29:29.888Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "7.3.- HOM-CATEGORIAS y tabulador de salarios de la CNEC. (Anexo No. 3).docx",
      "availability": "available",
      "size_bytes": "54884",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:31.091Z",
      "updated_at": "2025-12-07T11:29:31.092Z"
    },
    {
      "id": null,
      "annex_number": 19,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "7.3.- HOM-CATEGORIAS y tabulador de salarios de la CNEC. (Anexo No. 3).pdf",
      "availability": "available",
      "size_bytes": "106122",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:33.574Z",
      "updated_at": "2025-12-07T11:29:33.575Z"
    },
    {
      "id": null,
      "annex_number": 21,
      "document_type": null,
      "description": "CIRCULAR NO. 1 N-90-2023",
      "filename": "CIRCULAR No. 1 N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "384064",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:46.677Z",
      "updated_at": "2025-12-07T11:29:46.678Z"
    },
    {
      "id": null,
      "annex_number": 22,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA DE PRESENTACIÃ¿N Y APERTURA N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "2173663",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:49.412Z",
      "updated_at": "2025-12-07T11:29:49.413Z"
    },
    {
      "id": null,
      "annex_number": 24,
      "document_type": null,
      "description": "NOTA INFORMATIVA N-90-2023",
      "filename": "NOTA INFORMATIVA N-90-2023.pdf",
      "availability": "available",
      "size_bytes": "473712",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-07T11:29:52.234Z",
      "updated_at": "2025-12-07T11:29:52.235Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-09-210-009000999-n-140-2023",
      "nombre_procedimiento": "SEGUIMIENTO Y CONTROL, ASI COMO VERIFICACION DE CALIDAD PARA LA CONSTRUCCION PUE",
      "dependencia": "INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
      "siglas": "SICT",
      "score": 0.027413547039031982
    },
    {
      "numero_procedimiento": "lo-09-210-009000999-n-66-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL PUENTE TIPO ARCO METALICO “RIZO DE ORO\", INCLUYE ACCESOS Y LIGA",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.03273576498031616
    },
    {
      "numero_procedimiento": "lo-09-210-009000999-n-319-2026",
      "nombre_procedimiento": "SEGUIMIENTO Y CONTROL DEL PUENTE EN ARCO METÁLICO RIZO DE ORO- LA CONCORDIA",
      "dependencia": "INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
      "siglas": "SICT",
      "score": 0.04357868432998657
    },
    {
      "numero_procedimiento": "lo-09-210-009000999-n-40-2023",
      "nombre_procedimiento": "ELABORACIÓN DE ESTUDIOS Y PROYECTOS PARA LA MODERNIZACIÓN DEL PUENTE COPALA, UBI",
      "dependencia": "SICT",
      "siglas": "SICT",
      "score": 0.12763774394989014
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u991-n-30-2024",
      "nombre_procedimiento": "SUPERVISION Y VERIFICACION DEL CONTROL DE CALIDAD",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.14446085691452026
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u991-n-19-2024",
      "nombre_procedimiento": "SUPERVISION DE LOS TRABAJOS DEL PUENTE GRIJALVA",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.14753977685691977
    }
  ]
}