{
  "html_url": "https://licitia.com.mx/licitacion/lo-09-j0u-009j0u002-n-143-2024",
  "canonical": "https://licitia.com.mx/licitacion/lo-09-j0u-009j0u002-n-143-2024",
  "id": "84ec535b163340c0bba704ed798b42d4",
  "procedure_number": "LO-09-J0U-009J0U002-N-143-2024",
  "file_number": "E-2024-00055028",
  "title": "N-143/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE",
  "description": {
    "short": null,
    "detailed": "N-143/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE XOCHIMILCO KM 225+050 DEL C. D. CUACNOPALAN-OAXACA"
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "DESIERTO",
    "moved_at": null
  },
  "buyer": {
    "agency": "CAPUFE",
    "acronym": "CAPUFE",
    "branch": "09 - INFRAESTRUCTURA, COMUNICACIONES Y TRANSPORTES",
    "buying_unit": "DIRECCIÓN DE INFRAESTRUCTURA CARRETERA",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DIRECCIÓN DE INFRAESTRUCTURA CARRETERA",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "capufe",
    "unit_slug": "direccion-de-infraestructura-carretera-009j0u002"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "SERVICIOS RELACIONADOS CON LA OBRA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "N-143/24 OFC",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-05-20T22:41:44.000Z",
    "clarification_meeting_at": "2024-05-27T17:30:00.000Z",
    "clarification_questions_deadline_at": "2024-05-26T17:30:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-06-04T17:30:00.000Z",
    "award_at": "2024-06-27T17:00:00.000Z",
    "estimated_contract_at": "2024-07-01T06:00:00.000Z",
    "site_visit_at": "2024-05-24T16:00:00.000Z",
    "estimated_work_start_at": "2024-07-01T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62903-0001",
          "specific_item_code": "62903",
          "cucop_description": "SUPERVISION DE OBRAS PUBLICAS",
          "description": "SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE XOCHIMILCO KM 225+050 DEL C. D. CUACNOPALAN-OAXACA",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "N143.pdf",
      "availability": "available",
      "size_bytes": "2600361",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:28.107Z",
      "updated_at": "2025-12-04T11:30:28.109Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "1. Anexos Tecnicos Superv Pte Xochimilco.pdf",
      "availability": "available",
      "size_bytes": "29363149",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:11.323Z",
      "updated_at": "2025-12-04T11:30:11.324Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "1_ANEXO 01. Catalogo de Conceptos Super Puente Xochimilco.xlsx",
      "availability": "available",
      "size_bytes": "334730",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:13.015Z",
      "updated_at": "2025-12-04T11:30:13.016Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "02_PC-SROP_Modalidad_Precio_Unitario_V2.1_VF.docx",
      "availability": "available",
      "size_bytes": "68853",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:14.378Z",
      "updated_at": "2025-12-04T11:30:14.379Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "SERVICIOS RELACIONADOS CON LA OBRA PUBLICA (SERVICIOS DE SUPERVISION) 31.05.2023.docx",
      "availability": "available",
      "size_bytes": "200320",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:17.119Z",
      "updated_at": "2025-12-04T11:30:17.121Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "formatos",
      "filename": "DOF - Diario Oficial de la Federacion 28 junio de 2017 INFONAVIT.pdf",
      "availability": "available",
      "size_bytes": "111496",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:18.195Z",
      "updated_at": "2025-12-04T11:30:18.196Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "formatos",
      "filename": "FORMATOS ANEXOS SUPERVSION.docx",
      "availability": "available",
      "size_bytes": "629974",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:19.931Z",
      "updated_at": "2025-12-04T11:30:19.932Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "formatos",
      "filename": "FTOS TEC Y ECON SERVICIOS.xls",
      "availability": "available",
      "size_bytes": "915456",
      "mime_type": "application/vnd.ms-excel",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:22.958Z",
      "updated_at": "2025-12-04T11:30:22.959Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "formatos",
      "filename": "Formato para Registro de Empresas Participantes y su Personal.xlsx",
      "availability": "available",
      "size_bytes": "13008",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:24.117Z",
      "updated_at": "2025-12-04T11:30:24.118Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "formatos",
      "filename": "REGLAS PARA LA OBTENCION DEL 32 D EN MATERIA DE SEGURIDAD SOCIAL.pdf",
      "availability": "available",
      "size_bytes": "40613",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:25.269Z",
      "updated_at": "2025-12-04T11:30:25.270Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "N143 JTA ACLARACIONES.pdf",
      "availability": "available",
      "size_bytes": "461026",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:30.749Z",
      "updated_at": "2025-12-04T11:30:30.750Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "N143 NOTA ACLARATORIA JTA ACLARACIONES",
      "filename": "N143 NOTA ACLARATORIA JTA ACLARACIONES.pdf",
      "availability": "available",
      "size_bytes": "224839",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:33.563Z",
      "updated_at": "2025-12-04T11:30:33.565Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ANEXO 01. CATALOGO OBRA A SUPERVISAR",
      "filename": "Anexo 01. Catalogo - Pte Xochinilco-r2.pdf",
      "availability": "available",
      "size_bytes": "5217463",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:38.457Z",
      "updated_at": "2025-12-04T11:30:38.458Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ANEXO 02. ESP OBRA A SUPERVISAR",
      "filename": "Anexo 02. Esp Part - Pte Xochimilco-r2.pdf",
      "availability": "available",
      "size_bytes": "11628270",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:30:58.038Z",
      "updated_at": "2025-12-04T11:30:58.039Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ANEXO 03. ESP COMPL OBRA A SUPERVISAR",
      "filename": "Anexo 03. Esp Compl - Pte Xochimilco-r2.pdf",
      "availability": "available",
      "size_bytes": "18519183",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:31:18.501Z",
      "updated_at": "2025-12-04T11:31:18.502Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "0102_PLANO OBRA A SUPERVISAR",
      "filename": "0102_PLANO GENERAL PTE.XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "6046694",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:31:31.185Z",
      "updated_at": "2025-12-04T11:31:31.186Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "03 04 05 06_LOSA OBRA A SUPERVISAR",
      "filename": "03 04 05 06_LOSA CONTINUA PTE. XOCHIMILCO KM 225+050 1ra. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "5888626",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:31:39.004Z",
      "updated_at": "2025-12-04T11:31:39.005Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "07_TRABE DE OBRA A SUPERVISAR",
      "filename": "07_TRABE DE CLARO15 PTE. XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "53650505",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:03.639Z",
      "updated_at": "2025-12-04T11:32:03.640Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "08 09_TRABE OBRA A SUPERVISAR",
      "filename": "08 09_TRABE DE CLARO36 PTE. XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "53841781",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:21.035Z",
      "updated_at": "2025-12-04T11:32:21.036Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "1011_CABALLETE OBRA A SUPERVISAR",
      "filename": "1011_CABALLETE No.1 PTE. XOCHIMILCO KM 225+050 1RA ETAPA.dwg",
      "availability": "available",
      "size_bytes": "934387",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:22.447Z",
      "updated_at": "2025-12-04T11:32:22.449Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "12_PILA 2 PTE OBRA A SUPERVISAR",
      "filename": "12_PILA 2 PTE. XOCHIMILCO KM 225+050 1RA ETAPA.dwg",
      "availability": "available",
      "size_bytes": "607690",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:26.217Z",
      "updated_at": "2025-12-04T11:32:26.218Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "13_PILA OBRA A SUPERVISAR",
      "filename": "13_PILA 3 PTE. XOCHIMILCO KM 225+050 1RA ETAPA.dwg",
      "availability": "available",
      "size_bytes": "631796",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:27.531Z",
      "updated_at": "2025-12-04T11:32:27.532Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "1415_CABALLETE OBRA A SUPERVISAR",
      "filename": "1415_CABALLETE No.4 PTE. XOCHIMILCO 1RA ETAPA.dwg",
      "availability": "available",
      "size_bytes": "974531",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:29.066Z",
      "updated_at": "2025-12-04T11:32:29.067Z"
    },
    {
      "id": null,
      "annex_number": 19,
      "document_type": null,
      "description": "16_LOSA DE OBRA A SUPERVISAR",
      "filename": "16_LOSA DE ACCESO No.1 PTE. XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "844053",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:33.858Z",
      "updated_at": "2025-12-04T11:32:33.860Z"
    },
    {
      "id": null,
      "annex_number": 20,
      "document_type": null,
      "description": "17_LOSA DE ACCESO OBRA A SUPERVISAR",
      "filename": "17_LOSA DE ACCESO No. 2 PTE. XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "845021",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:38.188Z",
      "updated_at": "2025-12-04T11:32:38.189Z"
    },
    {
      "id": null,
      "annex_number": 21,
      "document_type": null,
      "description": "8_SEÑALAMIENTO OBRA A SUPERVISAR",
      "filename": "18_SEÃ¿ALAMIENTO PROV  1RA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "846279",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:41.204Z",
      "updated_at": "2025-12-04T11:32:41.205Z"
    },
    {
      "id": null,
      "annex_number": 22,
      "document_type": null,
      "description": "19_PROCEDIMIENTO  OBRA A SUPERVISAR",
      "filename": "19_PROCEDIMIENTO CONSTRUCTIVO_PTE.XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "847567",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:44.736Z",
      "updated_at": "2025-12-04T11:32:44.737Z"
    },
    {
      "id": null,
      "annex_number": 23,
      "document_type": null,
      "description": "01 02_PLANO OBRA A SUPERVISAR",
      "filename": "01 02_PLANO GENERAL PTE.XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "6293646",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:32:56.392Z",
      "updated_at": "2025-12-04T11:32:56.393Z"
    },
    {
      "id": null,
      "annex_number": 24,
      "document_type": null,
      "description": "03 04 05Y06_LOSA OBRA A SUPERVISAR",
      "filename": "03 04 05Y06_LOSA CONTINUA   2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "5865037",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:33:02.551Z",
      "updated_at": "2025-12-04T11:33:02.552Z"
    },
    {
      "id": null,
      "annex_number": 25,
      "document_type": null,
      "description": "07_TRABE DE OBRA A SUPERVISAR",
      "filename": "07_TRABE DE CLARO15 PTE. XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "53650791",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:33:30.164Z",
      "updated_at": "2025-12-04T11:33:30.165Z"
    },
    {
      "id": null,
      "annex_number": 26,
      "document_type": null,
      "description": "08 09_TRABE OBRA A SUPERVISAR",
      "filename": "08 09_TRABE DE CLARO36 PTE. XOCHIMILCO KM 225+050.dwg",
      "availability": "available",
      "size_bytes": "53843310",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:27.667Z",
      "updated_at": "2025-12-04T11:34:27.668Z"
    },
    {
      "id": null,
      "annex_number": 27,
      "document_type": null,
      "description": "10 11_CABALLETE OBRA A SUPERVISAR",
      "filename": "10 11_CABALLETE No.1 PTE. XOCHIMILCO KM 225+050 2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "927412",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:29.280Z",
      "updated_at": "2025-12-04T11:34:29.281Z"
    },
    {
      "id": null,
      "annex_number": 28,
      "document_type": null,
      "description": "12_PILA 2 OBRA A SUPERVISAR",
      "filename": "12_PILA 2 PTE. XOCHIMILCO KM 225+050 2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "615743",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:32.678Z",
      "updated_at": "2025-12-04T11:34:32.680Z"
    },
    {
      "id": null,
      "annex_number": 29,
      "document_type": null,
      "description": "13_PILA 3 OBRA A SUPERVISAR",
      "filename": "13_PILA 3 PTE. XOCHIMILCO KM 225+050 2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "622604",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:34.145Z",
      "updated_at": "2025-12-04T11:34:34.147Z"
    },
    {
      "id": null,
      "annex_number": 30,
      "document_type": null,
      "description": "14 15_CABALLETE OBRA A SUPERVISAR",
      "filename": "14 15_CABALLETE No.4 PTE. XOCHIMILCO 2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "925727",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:36.663Z",
      "updated_at": "2025-12-04T11:34:36.664Z"
    },
    {
      "id": null,
      "annex_number": 31,
      "document_type": null,
      "description": "16_LOSA DE OBRA A SUPERVISAR",
      "filename": "16_LOSA DE ACCESO No.1 PTE. XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "845127",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:38.121Z",
      "updated_at": "2025-12-04T11:34:38.122Z"
    },
    {
      "id": null,
      "annex_number": 32,
      "document_type": null,
      "description": "17_LOSA OBRA A SUPERVISAR",
      "filename": "17_LOSA DE ACCESO No. 2 PTE. XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "846044",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:40.574Z",
      "updated_at": "2025-12-04T11:34:40.575Z"
    },
    {
      "id": null,
      "annex_number": 33,
      "document_type": null,
      "description": "18_SEÑALAMIENTO OBRA A SUPERVISAR",
      "filename": "18_SEÃ¿ALAMIENTO PROV  2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "867337",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:42.280Z",
      "updated_at": "2025-12-04T11:34:42.281Z"
    },
    {
      "id": null,
      "annex_number": 34,
      "document_type": null,
      "description": "19_SEÑALAMIENTO OBRA A SUPERVISAR",
      "filename": "19_SEÃ¿ALAMIENTO DEFINITIVO 2DA. ETAPA.dwg",
      "availability": "available",
      "size_bytes": "798899",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:43.574Z",
      "updated_at": "2025-12-04T11:34:43.575Z"
    },
    {
      "id": null,
      "annex_number": 35,
      "document_type": null,
      "description": "20_PROCEDIMIENTO OBRA A SUPERVISAR",
      "filename": "20_PROCEDIMIENTO CONSTRUCTIVO_PTE.XOCHIMILCO.dwg",
      "availability": "available",
      "size_bytes": "848742",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:45.795Z",
      "updated_at": "2025-12-04T11:34:45.796Z"
    },
    {
      "id": null,
      "annex_number": 36,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "N143 ACTA APERTURA.pdf",
      "availability": "available",
      "size_bytes": "259114",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:47.271Z",
      "updated_at": "2025-12-04T11:34:47.272Z"
    },
    {
      "id": null,
      "annex_number": 37,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "N143 ACTA FALLO.pdf",
      "availability": "available",
      "size_bytes": "154403",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:48.621Z",
      "updated_at": "2025-12-04T11:34:48.622Z"
    },
    {
      "id": null,
      "annex_number": 38,
      "document_type": null,
      "description": "ANEXOS ACTA DE FALLO",
      "filename": "N143 FALLO.pdf",
      "availability": "available",
      "size_bytes": "2798505",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:50.953Z",
      "updated_at": "2025-12-04T11:34:50.954Z"
    },
    {
      "id": null,
      "annex_number": 39,
      "document_type": null,
      "description": "ANEXOS ACTA DE FALLO",
      "filename": "1 A ENCUESTA DEL PROCEDIMIENTO.pdf",
      "availability": "available",
      "size_bytes": "4954",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-04T11:34:52.555Z",
      "updated_at": "2025-12-04T11:34:52.557Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-09-j0u-009j0u002-n-162-2024",
      "nombre_procedimiento": "N-162/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.016428112983703613
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u002-n-134-2024",
      "nombre_procedimiento": "N-134/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: PUENTE PÁNUCO. - REPAR",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.05850135931364375
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u991-n-22-2024",
      "nombre_procedimiento": "SUPERVISION Y CONTROL DE CALIDAD DE LA OBRA:  REPARACION DEL PUENTE EL PEDREGAL",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.06668833096886628
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u002-n-86-2024",
      "nombre_procedimiento": "N-86/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE S",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.07260721489147881
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u002-n-132-2024",
      "nombre_procedimiento": "N-132/24 OFC SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: PUENTE CARACOL. - REPA",
      "dependencia": "CAMINOS Y PUENTES FEDERALES DE INGRESOS Y SERVICIOS CONEXOS",
      "siglas": "CAPUFE",
      "score": 0.07344049653056084
    },
    {
      "numero_procedimiento": "lo-09-j0u-009j0u010-n-43-2024",
      "nombre_procedimiento": "SUPERVISIÓN Y CONTROL DE CALIDAD DE LA OBRA: REPARACIÓN DEL PUENTE SIN NOMBRE UB",
      "dependencia": "CAPUFE",
      "siglas": "CAPUFE",
      "score": 0.07567942142486572
    }
  ]
}