  "title": "“OBRA MARÍTIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS\"",
  "description": {
    "short": null,
    "detailed": "“OBRA MARÍTIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS” CONSTRUCCIÓN DE OBRAS DE PROTECCIÓN MARÍTIMA A BASE DE ROCA Y ELEMENTOS PREFABRICADOS DE CONCRETO PARA LA CAPA DE CORAZA, CONSISTENTE EN AMPLIACIÓN DE LA ESCOLLERA NORTE: CON UNA LONGITUD DE CUERPO DE 750 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -7.00 METROS A -11.50 METROS. LA AMPLIACIÓN DE LA ESCOLLERA SUR, CON UNA LONGITUD DE CUERPO DE 50 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -6.00 METROS A -10.00 METROS. CIERRE DE LA ESCOLLERA SUR: PARA GENERAR UNA PLAYA ENCAJADA Y REDUCIR LA PENETRACIÓN DEL OLEAJE EN EL PUERTO; DE ACUERDO A LAS CARACTERÍSTICAS INDICADAS EN LOS PLANOS DEL PROYECTO EJECUTIVO Y DE LAS ESPECIFICACIONES GENERALES Y PARTICULARES DEL PRESENTE DOCUMENTO."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "ASIPONA-PUERTO CHIAPAS",
    "acronym": "ASIPONA-PUERTO CHIAPAS",
    "branch": "13 - MARINA",
    "buying_unit": "PUERTO CHIAPAS-GERENCIA DE OPERACIONES E INGENIERIA",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "PUERTO CHIAPAS-GERENCIA DE OPERACIONES E INGENIERIA",
    "entity": null,
    "slug": "asipona-puerto-chiapas",
    "unit_slug": "puerto-chiapas-gerencia-de-operaciones-e-ingenieria-013j3c002"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "ASIPONA-CHIS-GOI-05-2025",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-05-27T17:27:56.000Z",
    "clarification_meeting_at": "2025-06-06T15:00:00.000Z",
    "clarification_questions_deadline_at": "2025-06-05T15:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-06-16T15:00:00.000Z",
    "award_at": "2025-06-24T19:00:00.000Z",
    "estimated_contract_at": "2025-07-01T06:00:00.000Z",
    "site_visit_at": "2025-06-02T15:00:00.000Z",
    "estimated_work_start_at": "2025-07-01T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": "1825302952.26",
    "maximum": "1825302952.26",
    "currency": "MXN",
    "updated_at": "2026-01-23T18:23:15.000Z"
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0002",
          "specific_item_code": "62601",
          "cucop_description": "CONSTRUCCION DE OBRA MARITIMA",
          "description": "“OBRA MARÍTIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS” CONSTRUCCIÓN DE OBRAS DE PROTECCIÓN MARÍTIMA A BASE DE ROCA Y ELEMENTOS PREFABRICADOS DE CONCRETO PARA LA CAPA DE CORAZA, CONSISTENTE EN AMPLIACIÓN DE LA ESCOLLERA NORTE: CON UNA LONGITUD DE CUERPO DE 750 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -7.00 METROS A -11.50 METROS. LA AMPLIACIÓN DE LA ESCOLLERA SUR, CON UNA LONGITUD DE CUERPO DE 50 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -6.00 METROS A -10.00 METROS. CIERRE DE LA ESCOLLERA SUR: PARA GENERAR UNA PLAYA ENCAJADA Y REDUCIR LA PENETRACIÓN DEL OLEAJE EN EL PUERTO; DE ACUERDO A LAS CARACTERÍSTICAS INDICADAS EN LOS PLANOS DEL PROYECTO EJECUTIVO Y DE LAS ESPECIFICACIONES GENERALES Y PARTICULARES DEL PRESENTE DOCUMENTO.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2025-00064394",
      "internal_reference": "ASIPONA-CHIS-GOI-05-2025",
      "title": "“OBRA MARÍTIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS\"",
      "status": "PUBLICADO",
      "contractor": {
        "name": "REGIOMONTANA DE CONSTRUCCION Y SERVICIOS S A P I DE CV",
        "normalized_name": "REGIOMONTANA DE CONSTRUCCION Y SERVICIOS",
        "rfc_type": null,
        "slug": "regiomontana-de-construccion-y-servicios"
      },
      "contract_period": {
        "published_at": "2025-06-27T21:20:30.000Z",
        "starts_at": "2025-07-01T06:00:00.000Z",
        "ends_at": "2026-11-30T06:00:00.000Z"
      },
      "value": {
        "subtotal": "1573537027.81",
        "tax": "251765924.45",
        "total": "1825302952.26",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [
        {
          "number": "1",
          "name": "RECSA INGENIERIA PORTUARIA SA DE CV",
          "rfc_type": "moral"
        }
      ],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0002",
          "description": "“OBRA MARÍTIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS” CONSTRUCCIÓN DE OBRAS DE PROTECCIÓN MARÍTIMA A BASE DE ROCA Y ELEMENTOS PREFABRICADOS DE CONCRETO PARA LA CAPA DE CORAZA, CONSISTENTE EN AMPLIACIÓN DE LA ESCOLLERA NORTE: CON UNA LONGITUD DE CUERPO DE 750 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -7.00 METROS A -11.50 METROS. LA AMPLIACIÓN DE LA ESCOLLERA SUR, CON UNA LONGITUD DE CUERPO DE 50 METROS Y UN MORRO DE PROTECCIÓN DE 50 METROS DESPLANTADO A UNA COTA DE -6.00 METROS A -10.00 METROS. CIERRE DE LA ESCOLLERA SUR: PARA GENERAR UNA PLAYA ENCAJADA Y REDUCIR LA PENETRACIÓN DEL OLEAJE EN EL PUERTO; DE ACUERDO A LAS CARACTERÍSTICAS INDICADAS EN LOS PLANOS DEL PROYECTO EJECUTIVO Y DE LAS ESPECIFICACIONES GENERALES Y PARTICULARES DEL PRESENTE DOCUMENTO.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "1573537027.81",
          "tax": "251765924.45",
          "other_taxes": null,
          "total": "1825302952.26"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "CONVOCATORIA.pdf",
      "availability": "available",
      "size_bytes": "1655981",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:16:03.453Z",
      "updated_at": "2025-12-03T10:16:03.454Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FECHA Y HORA DE APERTURA DE PROPOSICIONES",
      "filename": "DIFERIMIENTO.pdf",
      "availability": "available",
      "size_bytes": "731368",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:16:52.473Z",
      "updated_at": "2025-12-03T10:16:52.474Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "ESP GENERALES.pdf",
      "availability": "available",
      "size_bytes": "1663129",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:16:06.593Z",
      "updated_at": "2025-12-03T10:16:06.594Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "MOD DE CONTRATO.docx",
      "availability": "available",
      "size_bytes": "72210",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:15:53.737Z",
      "updated_at": "2025-12-03T10:15:53.740Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "CROQUIS ALTERNATIVA DE FABRICACIÓN Y ALMACENAMIENTO DE CORE-LOC",
      "filename": "CROQUIS.pdf",
      "availability": "available",
      "size_bytes": "945930",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:15:55.432Z",
      "updated_at": "2025-12-03T10:15:55.433Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PLANOS.pdf",
      "availability": "available",
      "size_bytes": "354846",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:15:56.969Z",
      "updated_at": "2025-12-03T10:15:56.970Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "ACTA VISITA.pdf",
      "availability": "available",
      "size_bytes": "5065262",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:16:35.375Z",
      "updated_at": "2025-12-03T10:16:35.377Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "CATALOGO DE CONCEPTOS",
      "filename": "CAT ESCOLLERAS.pdf",
      "availability": "available",
      "size_bytes": "268629",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:15:58.337Z",
      "updated_at": "2025-12-03T10:15:58.338Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "ANEXOS DE CONVOCATORIA",
      "filename": "ANEXOS.pdf",
      "availability": "available",
      "size_bytes": "1943175",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:16:12.679Z",
      "updated_at": "2025-12-03T10:16:12.680Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO PREVIO A LA JUNTA DE ACLARACIONES",
      "filename": "Acta diferida.pdf",
      "availability": "available",
      "size_bytes": "1274893",
      "mime_type": "application/pdf",
      "sha256": "9469248c43b2d546bfc94537cd1083f04046054789ba5975b39631fd8369debd",
      "uploaded_at": "2025-12-03T10:16:42.097Z",
      "updated_at": "2026-08-06T03:03:02.014Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Acta diferida.pdf",
      "availability": "available",
      "size_bytes": "1274893",
      "mime_type": "application/pdf",
      "sha256": "9469248c43b2d546bfc94537cd1083f04046054789ba5975b39631fd8369debd",
      "uploaded_at": "2025-12-03T10:16:48.805Z",
      "updated_at": "2026-08-06T03:03:02.014Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ACTA DE ACLARACION 1",
      "filename": "ACTA 1.pdf",
      "availability": "available",
      "size_bytes": "22330771",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:18:14.477Z",
      "updated_at": "2025-12-03T10:18:14.478Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "Acta 2da JA.pdf",
      "availability": "available",
      "size_bytes": "7607652",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:18:36.204Z",
      "updated_at": "2025-12-03T10:18:36.205Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXO DE 2DA JUNTA DE ACLARACIONES",
      "filename": "anexo 2da JA.pdf",
      "availability": "available",
      "size_bytes": "315929",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:18:37.488Z",
      "updated_at": "2025-12-03T10:18:37.490Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA AP.pdf",
      "availability": "available",
      "size_bytes": "6691948",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:18:50.313Z",
      "updated_at": "2025-12-03T10:18:50.314Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "ACTA FALLO.pdf",
      "availability": "available",
      "size_bytes": "6234354",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-03T10:19:00.493Z",
      "updated_at": "2025-12-03T10:19:00.494Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-13-j3c-013j3c002-n-2-2025",
      "nombre_procedimiento": "PROYECTO EJECUTIVO OBRA MARITIMA PARA MINIMIZAR EL AZOLVE EN PUERTO CHIAPAS.",
      "dependencia": "ASIPONA-PUERTO CHIAPAS",
      "siglas": "ASIPONA-PUERTO CHIAPAS",
      "score": 0.16168017158986014
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-46-2023",
      "nombre_procedimiento": "OBRAS DE PROTECCIÓN PROVISIONAL Y REFORZAMIENTO DEL SEGUNDO CUERPO DEL ROMPEOLAS",
      "dependencia": "ASIPONA-VERACRUZ",
      "siglas": "ASIPONA-VERACRUZ",
      "score": 0.18486554532441624
    },
    {
      "numero_procedimiento": "lo-13-j3c-013j3c002-n-19-2024",
      "nombre_procedimiento": "REPOSICIÓN DE DEFENSAS MARINAS EN ASIPONA PUERTO CHIAPAS",
      "dependencia": "ASIPONA-PUERTO CHIAPAS",
      "siglas": "ASIPONA-PUERTO CHIAPAS",
      "score": 0.1855537184742727
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-5-2025",
      "nombre_procedimiento": "CONSTRUCCIÓN DE BARRERA DE PROTECCIÓN COSTERA A BASE DE COLOCACIÓN DE GEOTUBOS",
      "dependencia": "ASIPONA-VERACRUZ",
      "siglas": "ASIPONA-VERACRUZ",
      "score": 0.1862335073560628
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-48-2025",
      "nombre_procedimiento": "CONSTRUCCION DE ROMPEOLAS ORIENTE DE LA AMPLIACION DEL PUERTO DE VERACRUZ",
      "dependencia": "ASIPONA-VERACRUZ",
      "siglas": "ASIPONA-VERACRUZ",
      "score": 0.18692421718302588
    },
    {
      "numero_procedimiento": "lo-13-j3e-013j3e002-n-45-2025",
      "nombre_procedimiento": "CONSTRUCCION DE ROMPEOLAS ORIENTE DE LA AMPLIACION DEL PUERTO DE VERACRUZ",
      "dependencia": "ASIPONA-VERACRUZ",
      "siglas": "ASIPONA-VERACRUZ",