  "html_url": "https://licitia.com.mx/licitacion/lo-16-b00-016b00002-n-11-2023",
  "canonical": "https://licitia.com.mx/licitacion/lo-16-b00-016b00002-n-11-2023",
  "id": "aca6d1ad40624d8ebcac6fcfe82d4e2a",
  "procedure_number": "LO-16-B00-016B00002-N-11-2023",
  "file_number": "E-2023-00000384",
  "title": "CONSTRUCCIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE, PRESA SANTA MARÍA.",
  "description": {
    "short": null,
    "detailed": "CONSTRUCCIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE, INCLUYE ESTRUCTURAS, OBRA DE DESVÍO Y CANAL INTERMEDIO, PROYECTO BALUARTE-PRESIDIO, PRESA SANTA MARÍA, EN EL MUNICIPIO DE ROSARIO, ESTADO DE SINALOA."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "COMISION NACIONAL DEL AGUA",
    "acronym": "CONAGUA",
    "branch": "16 - MEDIO AMBIENTE Y RECURSOS NATURALES",
    "buying_unit": "DIRECCION GENERAL DEL ORGANISMO DE CUENCA PACIFICO NORTE",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "DIRECCION GENERAL DEL ORGANISMO DE CUENCA PACIFICO NORTE",
    "entity": null,
    "slug": "conagua",
    "unit_slug": "direccion-general-del-organismo-de-cuenca-pacifico-norte-016b00002"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2023,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "PC-016B00002-N1-2023",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2023-04-11T04:11:39.000Z",
    "clarification_meeting_at": "2023-04-19T15:00:00.000Z",
    "clarification_questions_deadline_at": "2023-04-18T15:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2023-04-28T14:00:00.000Z",
    "award_at": "2023-05-16T00:00:00.000Z",
    "estimated_contract_at": "2023-05-25T06:00:00.000Z",
    "site_visit_at": "2023-04-17T15:00:00.000Z",
    "estimated_work_start_at": "2023-05-25T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "62601-0007",
          "specific_item_code": "62601",
          "cucop_description": "OTRA CONSTRUCCION DE INGENIERIA CIVIL",
          "description": "CONSTRUCCIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE, INCLUYE ESTRUCTURAS, OBRA DE DESVÍO Y CANAL INTERMEDIO, PROYECTO BALUARTE-PRESIDIO, PRESA SANTA MARÍA, EN EL MUNICIPIO DE ROSARIO, ESTADO DE SINALOA",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": "1",
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2023-00040066",
      "internal_reference": "2023-B05-B28-CA-25-RF-LP-A-OR-0004",
      "title": "CONSTRUCCIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE, PRESA SANTA MARÍA.",
      "status": "PUBLICADO",
      "contractor": {
        "name": "OZONE ECOLOGICAL EQUIPMENTS SA DE CV",
        "normalized_name": "OZONE ECOLOGICAL EQUIPMENTS",
        "rfc_type": null,
        "slug": "ozone-ecological-equipments"
      },
      "contract_period": {
        "published_at": "2023-05-16T16:12:40.000Z",
        "starts_at": "2023-05-25T06:00:00.000Z",
        "ends_at": "2023-12-31T06:00:00.000Z"
      },
      "value": {
        "subtotal": "769515758.22",
        "tax": "123122521.32",
        "total": "892638279.54",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [
        {
          "number": "1",
          "name": "CONSTRUCTORA Y ARRENDADORA LOPEZ SA DE CV",
          "rfc_type": "moral"
        }
      ],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "62601-0007",
          "description": "CONSTRUCCIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE, INCLUYE ESTRUCTURAS, OBRA DE DESVÍO Y CANAL INTERMEDIO, PROYECTO BALUARTE-PRESIDIO, PRESA SANTA MARÍA, EN EL MUNICIPIO DE ROSARIO, ESTADO DE SINALOA",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "769515758.22",
          "tax": "123122521.32",
          "other_taxes": null,
          "total": "892638279.54"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "01.00 Convocatoria LO-16-B00-016B00002-N-11-2023.docx",
      "availability": "available",
      "size_bytes": "468842",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:19:39.543Z",
      "updated_at": "2025-12-05T03:19:39.544Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE SUSPENSIÓN DE JUNTA DE ACLARACIONES",
      "filename": "04.00 Suspension Junta de Aclaraciones N-11-2023.pdf",
      "availability": "available",
      "size_bytes": "398196",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:11.788Z",
      "updated_at": "2025-12-05T03:23:11.789Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "06.01 Diferimiento de fecha de fallo N-11-2023.pdf",
      "availability": "available",
      "size_bytes": "66696",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:49.064Z",
      "updated_at": "2025-12-05T03:23:49.065Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "08.00 Comunicado de fecha de fallo N11-2023.pdf",
      "availability": "available",
      "size_bytes": "658936",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:51.197Z",
      "updated_at": "2025-12-05T03:23:51.198Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "01.07 Especificaciones Tecnicas - Sifon cruce con el RIo Baluarte.pdf",
      "availability": "available",
      "size_bytes": "32031677",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:05.858Z",
      "updated_at": "2025-12-05T03:20:05.859Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "01.05 Modelo del Contrato(01_PC-OP_Modalidad_Precio_Unitario_V3.2_VF).DOCX",
      "availability": "available",
      "size_bytes": "83257",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:19:38.077Z",
      "updated_at": "2025-12-05T03:19:38.078Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "doc. legales y admon.",
      "filename": "01.02 Doc  Legales Administrativo LPN puntos y porcentajes.docx",
      "availability": "available",
      "size_bytes": "404598",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:07.439Z",
      "updated_at": "2025-12-05T03:20:07.440Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "formatos técnicos",
      "filename": "01.03 Anexos Técnicos LPN puntos y porcentajes.docx",
      "availability": "available",
      "size_bytes": "513517",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:09.074Z",
      "updated_at": "2025-12-05T03:20:09.075Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "formatos económicos",
      "filename": "01.04 Anexo Economico LPN puntos y porcentajes.docx",
      "availability": "available",
      "size_bytes": "675332",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:10.916Z",
      "updated_at": "2025-12-05T03:20:10.918Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "catatalogo de conceptos",
      "filename": "01.06 CATALOGO DE CONCEPTOS SIFON.pdf",
      "availability": "available",
      "size_bytes": "869550",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:12.899Z",
      "updated_at": "2025-12-05T03:20:12.900Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "modelo de fianzas",
      "filename": "01.08 Modelo de fianzas.pdf",
      "availability": "available",
      "size_bytes": "294464",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:14.329Z",
      "updated_at": "2025-12-05T03:20:14.330Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "lin. seguridad sanitaria",
      "filename": "01.09 Lineamientos_de_Seguridad_Sanitaria_F.pdf",
      "availability": "available",
      "size_bytes": "1038710",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:16.361Z",
      "updated_at": "2025-12-05T03:20:16.362Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "1-1 PERFIL SIFON.dwg",
      "availability": "available",
      "size_bytes": "18801826",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:44.278Z",
      "updated_at": "2025-12-05T03:20:44.279Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "10_PLANO COMPUERTA DESLIZANTE.dwg",
      "availability": "available",
      "size_bytes": "14719508",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:20:53.477Z",
      "updated_at": "2025-12-05T03:20:53.479Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "11_PLANO VÁLVULAS DE DESFOGUE.dwg",
      "availability": "available",
      "size_bytes": "16167714",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:21:03.123Z",
      "updated_at": "2025-12-05T03:21:03.124Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "1_PLANO GENERAL.dwg",
      "availability": "available",
      "size_bytes": "10347164",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:21:14.241Z",
      "updated_at": "2025-12-05T03:21:14.242Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "2_PLANO GENERAL DE LA ESTRUCTURA DE ENTRADA AL SIFÓN MD-01-11-2022.dwg",
      "availability": "available",
      "size_bytes": "11891918",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:21:25.423Z",
      "updated_at": "2025-12-05T03:21:25.424Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "3_ESTRUCTURA DE CONTROL DE ENTRADA AL SIFÓN MD.dwg",
      "availability": "available",
      "size_bytes": "13805674",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:21:44.948Z",
      "updated_at": "2025-12-05T03:21:44.950Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "4_ESTRUCTURA DE TRANSICION DE SALIDA DEL SIFÓN MD KM 3+050.dwg",
      "availability": "available",
      "size_bytes": "18300474",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:22:02.549Z",
      "updated_at": "2025-12-05T03:22:02.550Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "5_ESTRUCTURA DE TRANSICION DE ENTRADA AL SIFÓN 2 MD KM 3+810 FIN.dwg",
      "availability": "available",
      "size_bytes": "13721722",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:22:28.622Z",
      "updated_at": "2025-12-05T03:22:28.623Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "6_ESTRUCTURA DE TRANSICION DE SALIDA DEL SIFÓN MD KM 4+655.4.dwg",
      "availability": "available",
      "size_bytes": "7463184",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:22:38.793Z",
      "updated_at": "2025-12-05T03:22:38.795Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "Planos",
      "filename": "9_PLANO DE CORTES.dwg",
      "availability": "available",
      "size_bytes": "15778424",
      "mime_type": "application/octet-stream",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:04.818Z",
      "updated_at": "2025-12-05T03:23:04.819Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "resumen de convocatoria",
      "filename": "00.00 Resumen de convocatoria N11.pdf",
      "availability": "available",
      "size_bytes": "149420",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:06.076Z",
      "updated_at": "2025-12-05T03:23:06.077Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ACTA DE VISITA AL LUGAR DE LOS TRABAJOS",
      "filename": "03.00 Acta visita N11-2023.pdf",
      "availability": "available",
      "size_bytes": "3388982",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:10.665Z",
      "updated_at": "2025-12-05T03:23:10.666Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "14_PROCEDIMIENTO CONSTRUCTIVO-GENERAL.pdf",
      "availability": "available",
      "size_bytes": "1090307",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:13.359Z",
      "updated_at": "2025-12-05T03:23:13.360Z"
    },
    {
      "id": null,
      "annex_number": 17,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "Catalogo.pdf",
      "availability": "available",
      "size_bytes": "1133094",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:15.264Z",
      "updated_at": "2025-12-05T03:23:15.265Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "Especificaciones Tecnicas.pdf",
      "availability": "available",
      "size_bytes": "32648865",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:29.999Z",
      "updated_at": "2025-12-05T03:23:30.000Z"
    },
    {
      "id": null,
      "annex_number": 19,
      "document_type": null,
      "description": "ANEXOS ACTA DE JUNTA DE ACLARACIONES",
      "filename": "CATALOGO .xlsx",
      "availability": "available",
      "size_bytes": "42836",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:31.271Z",
      "updated_at": "2025-12-05T03:23:31.272Z"
    },
    {
      "id": null,
      "annex_number": 20,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "05.00 Acta de Junta de Aclaraciones  Conmstruccion Cruce Sinon N11-2023.pdf",
      "availability": "available",
      "size_bytes": "18026162",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:44.746Z",
      "updated_at": "2025-12-05T03:23:44.747Z"
    },
    {
      "id": null,
      "annex_number": 22,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "05.01 Acta de apertura N-11-2023_encrypted_.pdf",
      "availability": "available",
      "size_bytes": "421673",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:47.513Z",
      "updated_at": "2025-12-05T03:23:47.514Z"
    },
    {
      "id": null,
      "annex_number": 25,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "10.00 Fallo N-11-2023.pdf",
      "availability": "available",
      "size_bytes": "12375664",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:23:57.769Z",
      "updated_at": "2025-12-05T03:23:57.770Z"
    },
    {
      "id": null,
      "annex_number": 26,
      "document_type": null,
      "description": "ANEXOS ACTA DE FALLO",
      "filename": "11.00 Comunicacion de fallo N-11-2023_encrypted_.pdf",
      "availability": "available",
      "size_bytes": "638898",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T03:24:01.482Z",
      "updated_at": "2025-12-05T03:24:01.483Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-1-2023",
      "nombre_procedimiento": "SUPERVISIÓN DEL SIFÓN CRUCE CON EL RÍO BALUARTE PRESA SANTA MARÍA, SINALOA.",
      "dependencia": "COMISION NACIONAL DEL AGUA",
      "siglas": "CONAGUA",
      "score": 0.06843495776861486
    },
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-43-2023",
      "nombre_procedimiento": "CONSTRUCCION CPMI DEL KM. 21+820 AL 27+840 PRESA SANTA MARIA, ESCUINAPA, SINALOA",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.08830934236589849
    },
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-23-2023",
      "nombre_procedimiento": "CONSTRUCCIÓN DEL CPMI DEL RÍO BALUARTE DEL KM. 19+320 AL KM. 21+820, SANTA MARIA",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.09178971697153182
    },
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-12-2023",
      "nombre_procedimiento": "CONSRTUCCION ZONA DE RIEGO OJO DE AGUA, PROYECTO BALUARTE, MUNICIPIO DE ROSARIO",
      "dependencia": "COMISION NACIONAL DEL AGUA",
      "siglas": "CONAGUA",
      "score": 0.10201829063783185
    },
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-45-2023",
      "nombre_procedimiento": "CONSTRUCCION CPMI KM 32+340 AL KM 37+340, MPIO ROSARIO, SINALOA",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.10211372375488281
    },
    {
      "numero_procedimiento": "lo-16-b00-016b00002-n-39-2023",
      "nombre_procedimiento": "CONSTRUCCION DE ZONA DE RIEGO CHAGAREÑA,  PROYECTO BALUARTE-PRESIDIO, SINALOA",
      "dependencia": "CONAGUA",
      "siglas": "CONAGUA",
      "score": 0.10272842645645142
    }
  ]
}