{
  "html_url": "https://licitia.com.mx/licitacion/lo-69-q57-910018998-n-64-2025",
  "canonical": "https://licitia.com.mx/licitacion/lo-69-q57-910018998-n-64-2025",
  "id": "c0c7496dcdcc44f0b322d0efc046cc89",
  "procedure_number": "LO-69-Q57-910018998-N-64-2025",
  "file_number": "E-2025-00082615",
  "title": "REHABILITACION DE TRAMO EL SALTO",
  "description": {
    "short": null,
    "detailed": "REHABILITACIÓN DE UN TRAMO DE 310 ML DE TUBERÍA DE 10” DE LA LÍNEA DE CONDUCCIÓN MARGEN IZQUIERDA DE LA PRESA ROSILLA 1 A PLANTA POTABILIZADORA EN EL SALTO, YA QUE ESTE TRAMO SE ENCUENTRA EN MAL ESTADO, Y SE REQUIERE LA SUSTITUCIÓN DE TUBERÍA POR EL ALTO ÍNDICE DE FUGAS OCASIONANDO LA DISMINUCIÓN DE LA EFICIENCIA FÍSICA. DE LOS 310 ML EXISTENTES ACTUALMENTE 100 ML SON DE TUBERÍA DE ACERO LA CUAL YA ESTÁ CORROÍDA Y LOS OTROS 210 ML SON DE TUBERÍA PEAD YA DAÑADAS. \nSE TIENE CONTEMPLADO EL ENCOFRADO CON CONCRETO DE 100 ML DE LA LÍNEA LA CUAL ESTÁ A LA INTEMPERIE Y FACILITA LA CONEXIÓN DE TOMAS CLANDESTINAS. EN LA LOCALIDAD DE EL SALTO, PUEBLO NUEVO."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "ADJUDICADO",
    "moved_at": null
  },
  "buyer": {
    "agency": "CAED",
    "acronym": "CAED",
    "branch": "69 - DURANGO",
    "buying_unit": "SUBDIRECCIÓN DE ADMINISTRACIÓN Y FINANZAS",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "SUBDIRECCIÓN DE ADMINISTRACIÓN Y FINANZAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "caed",
    "unit_slug": "subdireccion-de-administracion-y-finanzas-910018998"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2025,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": null,
    "exception_basis": null,
    "internal_control_number": "EL SALTO CAED-PROAGUA-LOC-URBANAS-063-25",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2025-08-28T22:18:43.000Z",
    "clarification_meeting_at": "2025-09-02T16:00:00.000Z",
    "clarification_questions_deadline_at": "2025-09-01T16:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2025-09-12T16:00:00.000Z",
    "award_at": "2025-09-18T16:00:00.000Z",
    "estimated_contract_at": "2025-09-22T06:00:00.000Z",
    "site_visit_at": "2025-09-01T14:30:00.000Z",
    "estimated_work_start_at": "2025-09-23T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "61300-0101",
          "specific_item_code": "61300",
          "cucop_description": "CONSTRUCCION DE OBRA PARA EL ABASTECIMIENTO DE AGUA",
          "description": "REHABILITACIÓN DE UN TRAMO DE 310 ML DE TUBERÍA DE 10” DE LA LÍNEA DE CONDUCCIÓN MARGEN IZQUIERDA DE LA PRESA ROSILLA 1 A PLANTA POTABILIZADORA EN EL SALTO, YA QUE ESTE TRAMO SE ENCUENTRA EN MAL ESTADO, Y SE REQUIERE LA SUSTITUCIÓN DE TUBERÍA POR EL ALTO ÍNDICE DE FUGAS OCASIONANDO LA DISMINUCIÓN DE LA EFICIENCIA FÍSICA. DE LOS 310 ML EXISTENTES ACTUALMENTE 100 ML SON DE TUBERÍA DE ACERO LA CUAL YA ESTÁ CORROÍDA Y LOS OTROS 210 ML SON DE TUBERÍA PEAD YA DAÑADAS. \nSE TIENE CONTEMPLADO EL ENCOFRADO CON CONCRETO DE 100 ML DE LA LÍNEA LA CUAL ESTÁ A LA INTEMPERIE Y FACILITA LA CONEXIÓN DE TOMAS CLANDESTINAS. EN LA LOCALIDAD DE EL SALTO, PUEBLO NUEVO.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [
    {
      "id": "C-2025-00106753",
      "internal_reference": "CAED-PROAGUA-LOC-URBANAS-063-25",
      "title": "REHABILITACION DE TRAMO EL SALTO",
      "status": "PUBLICADO",
      "contractor": {
        "name": "PROYECTOS INMOBILIARIOS OLYCA SA DE CV",
        "normalized_name": "PROYECTOS INMOBILIARIOS OLYCA",
        "rfc_type": null,
        "slug": "proyectos-inmobiliarios-olyca"
      },
      "contract_period": {
        "published_at": "2025-10-07T21:48:58.000Z",
        "starts_at": "2025-09-23T06:00:00.000Z",
        "ends_at": "2025-11-21T06:00:00.000Z"
      },
      "value": {
        "subtotal": "1307990.57",
        "tax": "209278.49",
        "total": "1517269.06",
        "maximum_subtotal": "0",
        "maximum_total": "0",
        "currency": "MXN"
      },
      "open_contract_type": null,
      "quantity": null,
      "exercised_quantity": null,
      "participants": [],
      "line_items": [
        {
          "number": "0",
          "cucop_code": "61300-0101",
          "description": "REHABILITACIÓN DE UN TRAMO DE 310 ML DE TUBERÍA DE 10” DE LA LÍNEA DE CONDUCCIÓN MARGEN IZQUIERDA DE LA PRESA ROSILLA 1 A PLANTA POTABILIZADORA EN EL SALTO, YA QUE ESTE TRAMO SE ENCUENTRA EN MAL ESTADO, Y SE REQUIERE LA SUSTITUCIÓN DE TUBERÍA POR EL ALTO ÍNDICE DE FUGAS OCASIONANDO LA DISMINUCIÓN DE LA EFICIENCIA FÍSICA. DE LOS 310 ML EXISTENTES ACTUALMENTE 100 ML SON DE TUBERÍA DE ACERO LA CUAL YA ESTÁ CORROÍDA Y LOS OTROS 210 ML SON DE TUBERÍA PEAD YA DAÑADAS. \nSE TIENE CONTEMPLADO EL ENCOFRADO CON CONCRETO DE 100 ML DE LA LÍNEA LA CUAL ESTÁ A LA INTEMPERIE Y FACILITA LA CONEXIÓN DE TOMAS CLANDESTINAS. EN LA LOCALIDAD DE EL SALTO, PUEBLO NUEVO.",
          "unit": null,
          "requested_quantity": null,
          "awarded_quantity": null,
          "unit_price": null,
          "subtotal": "1307990.57",
          "tax": "209278.49",
          "other_taxes": null,
          "total": "1517269.06"
        }
      ]
    }
  ],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "convoca pub 6.pdf",
      "availability": "available",
      "size_bytes": "415980",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:48.077Z",
      "updated_at": "2025-12-05T01:26:48.078Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "N64 B EL SALTO.pdf",
      "availability": "available",
      "size_bytes": "8088550",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:53.369Z",
      "updated_at": "2025-12-05T01:26:53.370Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "Modelo Contra.docx",
      "availability": "available",
      "size_bytes": "54938",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:27.787Z",
      "updated_at": "2025-12-05T01:26:27.788Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "ANEXOS AE",
      "filename": "Anexos AE.DOCX",
      "availability": "available",
      "size_bytes": "552430",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:29.237Z",
      "updated_at": "2025-12-05T01:26:29.238Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "ANEXOS AT",
      "filename": "Anexos AT.DOCX",
      "availability": "available",
      "size_bytes": "444567",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:31.286Z",
      "updated_at": "2025-12-05T01:26:31.287Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "ANEXOS DLA",
      "filename": "Anexos DLA.docx",
      "availability": "available",
      "size_bytes": "340756",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:32.707Z",
      "updated_at": "2025-12-05T01:26:32.708Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "FORMATO FIANZA",
      "filename": "Fianzas Obra F.docx",
      "availability": "available",
      "size_bytes": "103768",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:34.646Z",
      "updated_at": "2025-12-05T01:26:34.647Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "PROG ANTICIPO",
      "filename": "Pro Anti.docx",
      "availability": "available",
      "size_bytes": "24793",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:36.662Z",
      "updated_at": "2025-12-05T01:26:36.663Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "CATALOGO",
      "filename": "CAT EL SALTO.xlsx",
      "availability": "available",
      "size_bytes": "436737",
      "mime_type": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:38.174Z",
      "updated_at": "2025-12-05T01:26:38.175Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ESPECIFICACIONES",
      "filename": "ESPECIFI SALTO.pdf",
      "availability": "available",
      "size_bytes": "1087753",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:40.711Z",
      "updated_at": "2025-12-05T01:26:40.713Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PANO SALTO.pdf",
      "availability": "available",
      "size_bytes": "1669191",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:46.142Z",
      "updated_at": "2025-12-05T01:26:46.143Z"
    },
    {
      "id": null,
      "annex_number": 13,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "N64 V El Salto.pdf",
      "availability": "available",
      "size_bytes": "598518",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:54.876Z",
      "updated_at": "2025-12-05T01:26:54.877Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "N64 J ElSALTO.pdf",
      "availability": "available",
      "size_bytes": "2468871",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:56.950Z",
      "updated_at": "2025-12-05T01:26:56.952Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "N64 A ELSALTO.pdf",
      "availability": "available",
      "size_bytes": "2396936",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:26:59.547Z",
      "updated_at": "2025-12-05T01:26:59.548Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "N64 F El Salto.pdf",
      "availability": "available",
      "size_bytes": "1303148",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-05T01:27:01.500Z",
      "updated_at": "2025-12-05T01:27:01.501Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-73-023-914130978-n-1-2025",
      "nombre_procedimiento": "SUSTITUCIÓN DE LÍNEA DE AGUA POTABLE CON TUBERÍA DE PVC DE 8” DE Ø Y 1,454.00 M",
      "dependencia": "SIAPA",
      "siglas": "SIAPA",
      "score": 0.18237090110778809
    },
    {
      "numero_procedimiento": "lo-61-n84-902026998-n-2-2025",
      "nombre_procedimiento": "REHABILITACION LC PLANA NOPALERA A TANQUE 101 7/7 ETAPA",
      "dependencia": "COMISIÓN ESTATAL DE SERVICIOS PÚBLICOS DE TECATE",
      "siglas": "CESPTE",
      "score": 0.18246180906664045
    },
    {
      "numero_procedimiento": "lo-61-n84-902026998-n-5-2024",
      "nombre_procedimiento": "REPOSICION DE TUBERIA ZONA PASO DEL AGUILA EN NODO DE ACCESO AUTOPISTA DE CUOTA",
      "dependencia": "CESPTE",
      "siglas": "CESPTE",
      "score": 0.18635146699240857
    },
    {
      "numero_procedimiento": "lo-69-q57-910018998-n-9-2023",
      "nombre_procedimiento": "REHABILITACIÓN DE LÍNEA DE CONDUCCIÓN LOS PINOS",
      "dependencia": "CAED",
      "siglas": "CAED",
      "score": 0.1883493774145456
    },
    {
      "numero_procedimiento": "lo-69-q57-910018998-n-60-2025",
      "nombre_procedimiento": "REHABILITACION DE LINEA DE DISTRIBUCION",
      "dependencia": "CAED",
      "siglas": "CAED",
      "score": 0.18878840107813755
    },
    {
      "numero_procedimiento": "lo-61-n84-902026998-n-7-2024",
      "nombre_procedimiento": "REHABILITACION LINEA DE CONDUCCION TANQUE CUCHUMA A TANQUE ESCORIAL",
      "dependencia": "CESPTE",
      "siglas": "CESPTE",
      "score": 0.19240908667986922
    }
  ]
}