  "html_url": "https://licitia.com.mx/licitacion/lo-86-x52-927009942-n-14-2024",
  "canonical": "https://licitia.com.mx/licitacion/lo-86-x52-927009942-n-14-2024",
  "id": "0e02736be7324fecaf34f6f2c00acc8c",
  "procedure_number": "LO-86-X52-927009942-N-14-2024",
  "file_number": "E-2024-00009467",
  "title": "14000923.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO DEL CAMINO",
  "description": {
    "short": "No existen bienes alternativos o sustitutos, Único Oferente, Derechos exclusivos (patentes, licencias, derechos de autor u otros derechos exclusivos), o por obras de arte.",
    "detailed": "14000923.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO DEL CAMINO EN EL EJIDO ANDRÉS QUINTANA ROO 2DA. SECCIÓN DEL KM. 8+100 AL KM. 11+300, MUNICIPIO DE TEAPA, TABASCO."
  },
  "lifecycle": {
    "section": "concluido",
    "source_status": "DESIERTO",
    "moved_at": null
  },
  "buyer": {
    "agency": "SOTOP",
    "acronym": "SOTOP",
    "branch": "86 - TABASCO",
    "buying_unit": "SUBSECRETARIA DE OBRAS PÚBLICAS",
    "requesting_unit": "unidad requiriente data",
    "requesting_group": "SUBSECRETARIA DE OBRAS PÚBLICAS",
    "entity": "TESORERÍA DE LA FEDERACIÓN",
    "slug": "sotop",
    "unit_slug": "area-de-adquisiciones-y-obra-publica-927009942"
  },
  "classification": {
    "procedure_type": "LICITACIÓN PÚBLICA",
    "contracting_type": "OBRA PÚBLICA",
    "publication_type": null,
    "character": "NACIONAL",
    "fiscal_year": 2024,
    "law": "LEY DE OBRAS PÚBLICAS Y SERVICIOS RELACIONADOS CON LAS MISMAS",
    "legal_basis_id": "1",
    "exception_basis": "Art. 41 fr. I",
    "internal_control_number": "SOTOP-SOP-014-CF/24",
    "supply_source_number": null
  },
  "schedule": {
    "published_at": "2024-02-06T15:32:18.000Z",
    "clarification_meeting_at": "2024-02-14T15:00:00.000Z",
    "clarification_questions_deadline_at": "2024-02-13T15:00:00.000Z",
    "clarification_responses_deadline_at": null,
    "bid_opening_at": "2024-02-22T17:30:00.000Z",
    "award_at": "2024-02-29T21:00:00.000Z",
    "estimated_contract_at": "2024-03-14T06:00:00.000Z",
    "site_visit_at": "2024-02-12T14:30:00.000Z",
    "estimated_work_start_at": "2024-03-14T06:00:00.000Z"
  },
  "estimated_value": {
    "minimum": null,
    "maximum": null,
    "currency": "MXN",
    "updated_at": null
  },
  "lots": [
    {
      "number": "1",
      "name": "PARTIDA SOLA",
      "description": "PARTIDA SOLA",
      "requirement_group_id": "1",
      "items": [
        {
          "number": "1",
          "cucop_code": "61500-0104",
          "specific_item_code": "61500",
          "cucop_description": "CONSTRUCCION DE CAMINO",
          "description": "14000923.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO DEL CAMINO EN EL EJIDO ANDRÉS QUINTANA ROO 2DA. SECCIÓN DEL KM. 8+100 AL KM. 11+300, MUNICIPIO DE TEAPA, TABASCO.",
          "requested_quantity": null,
          "minimum_quantity": null,
          "maximum_quantity": null,
          "unit": null,
          "minimum_amount": null,
          "maximum_amount": null
        }
      ]
    }
  ],
  "awards": [],
  "documents": [
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "CONVOCATORIA",
      "filename": "RESUMEN DE CONVOCATORIA 3.pdf",
      "availability": "available",
      "size_bytes": "1099443",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:53:35.508Z",
      "updated_at": "2025-12-12T04:53:35.510Z"
    },
    {
      "id": null,
      "annex_number": 1,
      "document_type": null,
      "description": "AVISO DE DIFERIMIENTO DE FALLO",
      "filename": "ACTA DE DIFERIMIENTO DE FALLO 014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "820212",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:22.018Z",
      "updated_at": "2025-12-12T04:55:22.019Z"
    },
    {
      "id": null,
      "annex_number": 2,
      "document_type": null,
      "description": "ANEXO TÉCNICO",
      "filename": "BASES-014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "68190553",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:06.527Z",
      "updated_at": "2025-12-12T04:54:06.528Z"
    },
    {
      "id": null,
      "annex_number": 3,
      "document_type": null,
      "description": "MODELO DE CONTRATO",
      "filename": "01_PC-OP_Modalidad_Precio_Unitario_V3.2_VF (4) (1).docx",
      "availability": "available",
      "size_bytes": "83004",
      "mime_type": "application/vnd.openxmlformats-officedocument.wordprocessingml.document",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:07.794Z",
      "updated_at": "2025-12-12T04:54:07.795Z"
    },
    {
      "id": null,
      "annex_number": 4,
      "document_type": null,
      "description": "FIANZAS",
      "filename": "Fianzas Federales (5) (1).pdf",
      "availability": "available",
      "size_bytes": "248650",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:09.335Z",
      "updated_at": "2025-12-12T04:54:09.336Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "ALCANCES Y ESPECIFICACIONES GENERALES Y PARTICULARES",
      "filename": "ANEXO ESPECIFICACIONES GENERALES.pdf",
      "availability": "available",
      "size_bytes": "2730590",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:11.774Z",
      "updated_at": "2025-12-12T04:54:11.775Z"
    },
    {
      "id": null,
      "annex_number": 5,
      "document_type": null,
      "description": "ALCANCES Y ESPECIFICACIONES GENERALES Y PARTICULARES",
      "filename": "ESPECIFICACIONES PARTICULARES (01-02-24).pdf",
      "availability": "available",
      "size_bytes": "24158207",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:29.451Z",
      "updated_at": "2025-12-12T04:54:29.452Z"
    },
    {
      "id": null,
      "annex_number": 6,
      "document_type": null,
      "description": "CROQUIS",
      "filename": "CROQUIS DE LOCALIZACION.pdf",
      "availability": "available",
      "size_bytes": "407590",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:31.577Z",
      "updated_at": "2025-12-12T04:54:31.578Z"
    },
    {
      "id": null,
      "annex_number": 7,
      "document_type": null,
      "description": "CATALOGO DE CONCEPTOS",
      "filename": "CATALOGO DE CONCEPTOS (01-02-24).pdf",
      "availability": "available",
      "size_bytes": "3240247",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:36.055Z",
      "updated_at": "2025-12-12T04:54:36.056Z"
    },
    {
      "id": null,
      "annex_number": 8,
      "document_type": null,
      "description": "ANEXO DE MEDIDAS DE PROTECCION",
      "filename": "ANEXO DE MEDIDAS DE PROTECCION.pdf",
      "availability": "available",
      "size_bytes": "2005698",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:42.946Z",
      "updated_at": "2025-12-12T04:54:42.947Z"
    },
    {
      "id": null,
      "annex_number": 9,
      "document_type": null,
      "description": "ANEXO EN MATERIA AMBIENTAL",
      "filename": "ANEXO EN MATERIA AMBIENTAL.pdf",
      "availability": "available",
      "size_bytes": "2378647",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:47.452Z",
      "updated_at": "2025-12-12T04:54:47.453Z"
    },
    {
      "id": null,
      "annex_number": 10,
      "document_type": null,
      "description": "ANEXO PRUEBAS DE CALIDAD",
      "filename": "ANEXO PRUEBAS DE CALIDAD (01-02-24).pdf",
      "availability": "available",
      "size_bytes": "3265755",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:50.231Z",
      "updated_at": "2025-12-12T04:54:50.232Z"
    },
    {
      "id": null,
      "annex_number": 11,
      "document_type": null,
      "description": "ANEXO REQUISITOS DE CALIDAD",
      "filename": "ANEXO REQUISITOS DE CALIDAD DE LOS MATERIALES.pdf",
      "availability": "available",
      "size_bytes": "5201837",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:54:58.227Z",
      "updated_at": "2025-12-12T04:54:58.228Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PAV-01.pdf",
      "availability": "available",
      "size_bytes": "4062501",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:00.720Z",
      "updated_at": "2025-12-12T04:55:00.721Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PAV-02.pdf",
      "availability": "available",
      "size_bytes": "3871416",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:08.805Z",
      "updated_at": "2025-12-12T04:55:08.806Z"
    },
    {
      "id": null,
      "annex_number": 12,
      "document_type": null,
      "description": "PLANOS",
      "filename": "PAV-03.pdf",
      "availability": "available",
      "size_bytes": "5326709",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:11.690Z",
      "updated_at": "2025-12-12T04:55:11.691Z"
    },
    {
      "id": null,
      "annex_number": 14,
      "document_type": null,
      "description": "CONSTANCIA DE VISITA",
      "filename": "ACTA DE VISITA DE OBRA - 014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "662099",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:13.461Z",
      "updated_at": "2025-12-12T04:55:13.462Z"
    },
    {
      "id": null,
      "annex_number": 15,
      "document_type": null,
      "description": "ACTA JUNTA DE ACLARACIONES",
      "filename": "JTA-014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "1250090",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:15.878Z",
      "updated_at": "2025-12-12T04:55:15.879Z"
    },
    {
      "id": null,
      "annex_number": 16,
      "document_type": null,
      "description": "ACTA DE APERTURA DE PROPOSICIONES",
      "filename": "ACTA DE APERTURA 014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "3837568",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:17.834Z",
      "updated_at": "2025-12-12T04:55:17.835Z"
    },
    {
      "id": null,
      "annex_number": 18,
      "document_type": null,
      "description": "ACTA DE FALLO",
      "filename": "ACTA DE FALLO DESIERTO - 014-CF-24.pdf",
      "availability": "available",
      "size_bytes": "2262720",
      "mime_type": "application/pdf",
      "sha256": null,
      "uploaded_at": "2025-12-12T04:55:25.859Z",
      "updated_at": "2025-12-12T04:55:25.860Z"
    }
  ],
  "alternates": [],
  "similar": [
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-25-2024",
      "nombre_procedimiento": "14000923.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO DEL CAMINO EN EL EJIDO ANDRÉS QUI",
      "dependencia": "SECRETARÍA DE ORDENAMIENTO TERRITORIAL Y OBRAS PÚBLICAS (TAB)",
      "siglas": "SOTOP",
      "score": 0.009803386003283121
    },
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-31-2024",
      "nombre_procedimiento": "14000944.- CONSTRUCCIÓN DE PAVIMENTO CON CONCRETO ASFÁLTICO,  PUXCATAN TACOTALPA",
      "dependencia": "SOTOP",
      "siglas": "SOTOP",
      "score": 0.07888001203536332
    },
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-24-2023",
      "nombre_procedimiento": "14000738.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO EN TRAMOS AISLADOS CAMINO TEAPA",
      "dependencia": "SOTOP",
      "siglas": "SOTOP",
      "score": 0.08085018396376908
    },
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-15-2024",
      "nombre_procedimiento": "14000859.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO EN TRAMOS AISLADOS",
      "dependencia": "SOTOP",
      "siglas": "SOTOP",
      "score": 0.08293229341506303
    },
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-7-2024",
      "nombre_procedimiento": "14000900.- CONSTRUCCIÓN DE PAVIMENTO CON CONCRETO ASFÁLTICO EN EL CAMINO",
      "dependencia": "SOTOP",
      "siglas": "SOTOP",
      "score": 0.08326403050995101
    },
    {
      "numero_procedimiento": "lo-86-x52-927009942-n-10-2024",
      "nombre_procedimiento": "14000858.- CONSTRUCCIÓN DE PAVIMENTO ASFÁLTICO EN TRAMOS AISLADOS",
      "dependencia": "SOTOP",
      "siglas": "SOTOP",
      "score": 0.08586985384642043
    }
  ]
}